Markets Committee Materials
Aug 27-28, 2008
One of the three Technical Committees that advises ISO New England and the Participants Committee. Provides input on procedures affecting the daily operation and administration of New England's bulk electric power market.

Date Document Title Document Type
Aug 26, 2008 ZIP (1.5Mb)
Aug 26, 2008 ZIP (151k)
Aug 26, 2008 ZIP (171k)
Aug 28, 2008 ZIP (246k)
Aug 21, 2008
Revisions to Forward Capacity Market Rules to Better Integrate Demand Resources into ISO Operations - Part IV - By Henry Yoshimura
PPT (717k)
Aug 21, 2008 DOC (56.5k)
Aug 21, 2008 DOC (241k)
Aug 21, 2008 DOC (211k)
Aug 21, 2008
Modeling Passive Resources as Reduction to Load in the Westinghouse Model - By Maria Agustin
PDF (272k)
Aug 26, 2008
Impact of Demand Resources on Installed Capacity Requirement - By Peter Wong
PPT (430k)
Aug 26, 2008
Reserve Margin "Gross-Up" for Demand Resources - By Bob Ethier and Henry Yoshimura
PPT (337k)
Aug 26, 2008 DOC (38.5k)
Aug 21, 2008
Amendments to ISO-NE OATT to Incorporate FCM/Q Term Sheet - From Alan McBride and Monica Gonzalez
DOC (42.5k)
Aug 21, 2008
Amendments to Section III.13 of Market Rule 1 to Incorporate FCM/Q Term Sheet - From Alan McBride and Monica Gonzalez
DOC (38.5k)
Aug 21, 2008 DOC (87k)


  Copyright ©2008 ISO New England Inc.