Demand Resources Group Materials
Develops recommendations for the Transition Period rules, treatment of energy efficiency in the Forward Capacity Market, and the evolution of current demand response programs and their treatment in the Forward Capacity Market.
Date Document Title Document Type
Sep 11, 2006
Description of an alternative approach to providing Performance Incentives to Demand Resources as discussed during the September 6, 2006 DRG meeting.
DOC (34k)
Sep 06, 2006
Presentation at the Sept. 7, 2006 DRG meeting by Chuck Goldman. The presentation includes a "straw proposal" on the qualification process for Demand Resource projects.
PPT (38k)
Sep 06, 2006
Presentation at the Sept. 7, 2006 DRG meeting by ISO New England. The presentation includes an outlines the ISO's initial thoughts regarding qualification process, timeline and materials to be submitted.
PPT (481k)
Aug 24, 2006
The M&V sections of the Transition rules present to the DRG at the August 25, 2006 meeting.
DOC (47.5k)
Aug 24, 2006
Proposed M&V provisions for FCM rules presented for discuss at the DRG at the August 25, 2006 meeting.
DOC (58.5k)
Aug 24, 2006
Monitoring and Verification presentation for the August 25, 2006 meeting of the DRG.
PPT (805k)
Aug 09, 2006 PPT (447k)
Aug 09, 2006 PPT (711k)
Aug 09, 2006 DOC (33k)
Aug 01, 2006
DRG recommendation concerning the Installed Capacity Requirement Calculation and Treatment of Demand Resources in the Load Forecast to the Installed Capacity Stakeholder Working Group. Recommendation section reviewed at the July 27 DRG meeting.
DOC (30k)
Jul 26, 2006 DOC (29k)
Jul 26, 2006
Example illustrating how an ODR's Demand Reduction Value would be calculated using Critical Peak Hours for the period April to November
XLS (16.5k)
Jul 26, 2006
Proposed changes to MR1 to include Critical Peak Hours for ODR
DOC (30k)
Jul 26, 2006
NECPUC Resolution on Energy Efficiency and Conservation Measurement Protocols.
DOC (24k)
Jul 26, 2006 PPT (152k)
Jul 26, 2006 DOC (33.5k)
Jul 20, 2006
Directions to the Radisson Hotel in Chelmsford, MA
DOC (26k)
Jul 18, 2006
Summary of future action items and the production schedule for the DRG updated following the 07-14-2006 meeting. Update of presentation by Henry Yoshimura
PPT (396k)
Jul 18, 2006
Summary of the actions already taken by the DRG through June 2006.
PPT (381k)
Jul 13, 2006
Presentation to the DRG based on the discussion paper "Pricing Electricity Capacity in New England" prepared by Dr. Tom Austin.
PPT (34.5k)


  Copyright ©2008 ISO New England Inc.