Demand Resources Group Materials
Develops recommendations for the Transition Period rules, treatment of energy efficiency in the Forward Capacity Market, and the evolution of current demand response programs and their treatment in the Forward Capacity Market.
Date Document Title Document Type
Jul 13, 2006
Presentation to the DRG regarding the ICAP tag process and the necessary data for load reconstitution from the meter reader's perspective. Presented by Carmel Gondek.
PPT (75.5k)
Jul 13, 2006
Summary of future action items and the production schedule for the DRG as of 07-14-2006. Presentation by Henry Yoshimura.
PPT (535k)
Jun 16, 2006
Discussion paper on capacity pricing in New England prepared by Dr. Tom Austin.
DOC (50.5k)
Jun 16, 2006
Paper describing approaches to integrate Demand Resources into the Forward Capacity Market prepared by ISO New England.
DOC (87.5k)
Jun 16, 2006
Paper by Synapse Energy describing a methodology to ensure the Forward Capacity Market properly values energy efficiency resources. Updated June 12, 2006
PDF (235k)
Jun 16, 2006
Presentation by Robert Laurita to the DRG depicting an analysis of four different treatments.
PPT (539k)
Jun 09, 2006
Presentation by Doug Hurley and Paul Peterson, Synapse Energy Economics, Inc. dated June 5, 2006
PDF (253k)
Jun 09, 2006
Issues, Criteria, and Approaches - Presentation for the Demand Resources Group Meeting dated June 9, 2006
PDF (118k)
Jun 09, 2006
Ensuring the Capacity Market Properly Values Energy Efficiency Resources - Report prepared by Paul Peterson, Doug Hurley, Tim Woolf and Bruce Biewalk, Synapse Energy Economics
PDF (235k)
Jun 02, 2006
Updated final version of the DRG recommended Transition Rules in clean format resulting from the May 30, 2006 meeting, and follow-up clarifications.
DOC (54k)
May 31, 2006
The recommendation for handling Load Reconstitution during the Transition Period resulting from the May 30, 2006 meeting comments.
DOC (20k)
May 31, 2006
The final version of the DRG recommended Transition Rules in clean format resulting from the May 30, 2006 meeting.
DOC (50k)
May 31, 2006
The final version of the DRG recommended Transition Rules in redline/strikeout format resulting from the May 30, 2006 meeting.
DOC (53k)
May 26, 2006
05-26-2006 Version of the draft Transition Rules for review by the DRG
DOC (53k)
May 25, 2006
This document represents the initial recommendation to the DRG by the Load Reconstitution Sub-Group regarding the treatment of ODRs and Load Reconstitution during the Transition Period. It is the result of a conference call held on May 24, 2006.
DOC (20.5k)
May 18, 2006 PPT (41k)
May 18, 2006 DOC (73k)
May 18, 2006
Presentation by Shannon L. Hann, Director Market Analysis & Settlements
PPT (2.4Mb)
May 18, 2006 DOC (67k)
May 12, 2006
Version from May 12, 2006 - Draft for discussion purposes only
DOC (48.5k)


  Copyright ©2008 ISO New England Inc.