Economic Study Process Stakeholder Group Materials
Apr 18, 2008
Stakeholder forum to discuss process for implementing market efficiency transmission upgrades and economic studies

Date Document Title Document Type
Apr 16, 2008 PDF (121k)
Apr 17, 2008
Description of the request by MPS and CMP for the ISO to study the Maine Power Connection under Attachment N of the Tariff
PDF (185k)
Apr 17, 2008
Description of the draft assumptions for the study of the Maine Power Connection under Attachment N of the Tariff
PDF (925k)
  Copyright ©2008 ISO New England Inc.