Intermittent Resource Working Group Materials
Develops a method to determine the Qualified Capacity of wind, solar and run-of-the river hydro resources (Intermittent Resources) for the Forward Capacity Market.
Date Document Title Document Type
Oct 20, 2006
Analytical study of the optimum sample size for determining Reliability Hours
ZIP (73.4k)
Oct 17, 2006
Final draft results of the Intermittent Resources Study, for wind power generation
ZIP (2.2Mb)
Aug 22, 2006
Estimate of Wind/Hydro Generation During Hours of System Peak Load
PDF (32.7k)
Aug 02, 2006
Draft Proposal - Revision 3 - To establish a distinct method to determine the Qualified Capacity MW value of intermittent resources in the Forward Capacity Market ("FCM")
PDF (22.5k)
Jul 27, 2006 PDF (14.0k)
Jul 07, 2006
Draft Proposal - Revision 2 - To establish a distinct method to determine the Qualified Capacity MW value of intermittent resources in the Forward Capacity Market ("FCM")
PDF (25.1k)
Jun 22, 2006
Draft Proposal - Revision 1 - To establish a distinct method to determine the Qualified Capacity MW value of intermittent resources in the Forward Capacity Market ("FCM")
PDF (23.3k)
Jun 20, 2006
Draft Proposal - Revision 0 - To establish a distinct method to determine the Qualified Capacity MW value of intermittent resources in the Forward Capacity Market ("FCM")
PDF (23.6k)
Jun 16, 2006
Final draft - Revision 1 - To establish a distinct method to determine the Qualified Capacity MW value of intermittent resources in the Forward Capacity Auction ("FCA")
PDF (17.7k)
Jun 16, 2006
Memo from Dennis Duffy, Energy Management, Inc. to Intermittent Resource Working Group and Roger Bacon - Redacted version
PDF (15.4k)
May 22, 2006
Presentation given by the Intermittent Resource Working Group on May 22, 2006
PDF (116k)
May 05, 2006
For Intermittent Resource Capacity in Forward Capacity Auction - Analysis dated April 26, 2006 by Steve Wiese, Conservation Services Group
PDF (30.3k)
May 05, 2006
(Revised Version) To establish a distinct method to determine the Qualified Capacity MW of intermittent resources in the Forward Capacity Auction ("FCA")
PDF (18.7k)
May 03, 2006
To establish a distinct method to determine the Qualified Capacity MW of intermittent resources in the Forward Capacity Auction ("FCA")
PDF (22.7k)
  Copyright ©2008 ISO New England Inc.