Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.
| Date |
Document Title |
Document Type |
|
| May 02, 2006 |
Includes agenda items A2 through A4.3 |
 |
ZIP (6.4Mb) |
|
| May 02, 2006 |
Includes agenda items A4.3 through A12 |
 |
ZIP (4.4Mb) |
|
| May 02, 2006 |
Includes motions and studies regarding Dooley, Sasco Creek and Sudbury |
 |
ZIP (4.1Mb) |
|
| May 02, 2006 |
Includes motions appendices regarding Bellows and Chelsea |
 |
ZIP (4.8Mb) |
|
| Mar 24, 2006 |
Cover letter from Steven Masse, System Planning, NSTAR to Stephen Rourke, Director, System Operations and Reliability, ISO New England regarding the addition of a 52.5 MVA, 118kV capacitor bank at Sudbury Substation |
 |
PDF (31.3k) |
|
| Apr 26, 2006 |
At the Sudbury Substation - Letter from Kevin Mankouski, Chair, Transmission Task Force to the NEPOOL Reliability Committee Members |
 |
DOC (179k) |
|
| Mar 24, 2006 |
Application from NSTAR Electric & Gas Corp for the addition of a 52.5 MVAR, 118kV Capacitor at Sudbury Substation #342 at Sudbury, Massachusetts |
 |
PDF (58.1k) |
|
| Apr 25, 2006 |
Letter from Jim Helton, Chair, Stability Task Force and Kevin Mankouski, Chair, Transmission Task Force to the NEPOOL Reliability Committee |
 |
DOC (186k) |
|
| Apr 14, 2006 |
Application from NSTAR Electric to construct a six breaker 115 kV ring bus at Chelsea Substation #488 - Includes cover letter |
 |
PDF (204k) |
|
| May 01, 2006 |
Letter from Jim Helton, Chair, Stability Task Force and Kevin Mankouski, Chair, Transmission Task Force to the NEPOOL Reliability Committee - Revised version |
 |
DOC (191k) |
|
| Apr 25, 2006 |
Letter from Jim Helton, Chair, Stability Task Force and Kevin Mankouski, Chair, Transmission Task Force to the NEPOOL Reliability Committee |
 |
DOC (184k) |
|
| Apr 12, 2006 |
Application from the New England Power Company for Bellows Falls Substation Revitalizaion - Includes cover letter - Revised version |
 |
PDF (413k) |
|
| Apr 26, 2006 |
Application from the New England Power Company for Bellows Falls Substation Revitalizaion - Includes cover letter |
 |
PDF (413k) |
|
| Apr 25, 2006 |
Letter from Jim Helton, Chair, Stability Task Force and Kevin Mankouski, Chair, Transmission Task Force to the NEPOOL Reliability Committee |
 |
DOC (179k) |
|
| Apr 18, 2006 |
Application from Northeast Utilities for Installation of a 115-kV Circuit Breaker from West Side 115kV to Dooley 115kV - Includes cover letter |
 |
PDF (283k) |
|
| Apr 26, 2006 |
And 115-kV Circuit Breaker at the Sasco Creek 21R Substation - Letter from Kevin Mankouski, Chair, Transmission Task Force to the NEPOOL Reliability Committee Members |
 |
DOC (180k) |
|
| Apr 18, 2006 |
Application from Northeast Utilities for a 115/13.8-kV Transformer & 115-kV Circuit Breaker at Sasco Creek 21R Substation - Includes cover letter |
 |
PDF (65.1k) |
|
| Apr 17, 2006 |
Cover letter from Jeffrey Fenn, PE, SGC Engineering for Bangor Hydro Electric Company to Don Gates, Chairman, NEPOOL Reliability Committee |
 |
DOC (40k) |
|
| Apr 14, 2006 |
Application from Bangor Hydro Electric Co. to Tap Line 61 from Boggy Brook in Hancock to Harrington Substation in Harrington, Maine |
 |
DOC (337k) |
|
| Apr 26, 2006 |
Letter from Kevin Mankouski, Chair, Transmission Task Force to the NEPOOL Reliability Committee Members |
 |
DOC (181k) |
|
| Apr 17, 2006 |
Cover letter from Jeffrey Fenn, PE, SGC Engineering for BHE to Don Gates, Chairman, NEPOOL Reliability Committee |
 |
DOC (39k) |
|
| Apr 06, 2006 |
Application from Bangor Hydro Electric Co. for Transmission from Boggy Brook in Ellsworth, Maine to Trenton Substation (New facility) |
 |
DOC (333k) |
|
| Mar 23, 2006 |
Cover letter from Paul Robinson, Sr. Engineer, System Planning - NSTAR to Mr. Steven Rourke, Director, System Operations and Reliability, ISO New England |
 |
DOC (47.5k) |
|
| Mar 23, 2006 |
Application from NSTAR Electric & Gas Corp. for Transformer and Distribution Facilities at the Needham Substation #148 in Needham, Massachusetts |
 |
DOC (565k) |
|
| Apr 13, 2006 |
Application from Northeast Utilities to install a new 345-kV circuit breaker at the Deerfield Substation |
 |
PDF (36.1k) |
|