Reliability Committee Materials
May 2, 2006
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Apr 13, 2006
Application from Northeast Utilities (Public Service Company of New Hampshire) to install a new 345-kV circuit breaker at PSNH's Deerfield Substation in series with the existing 851 circuit breaker
PDF (33.9k)
Apr 17, 2006
Application from Northeast Utilities to install a new 115kV circuit breaker and relaying work at Dooley 30K substation - Includes cover letter
PDF (287k)
Mar 10, 2003
For the Northeast Reliability Interconnect Project
DOC (20k)
Apr 18, 2006
Cover letter from Jeffrey Fenn, PE, SGC Engineering for Bangor Hydro Electric to Don Gates, Chairman, NEPOOL Reliability Committee
DOC (30.5k)
Jun 08, 2004
Cover letter from Rob Bennett, General Manager, T&D Assets, Bangor Hydro Electric Co. to Mr. Steve Rourke, NEPOOL Reliability Committee
DOC (20k)
Jul 28, 2004
Northeast Reliability Interconnect Project - Letter from Stephen G. Whitley, Senior Vice President and COO to Rob Bennett, General Manager, T&D Assets, Bangor Hydro Electric Co.
PDF (3.5Mb)
Apr 18, 2006
Application from Bangor Hydro Electric Co. for the project known as the Northeast Reliability Interconnect
DOC (46.5k)
Jan 17, 2003
Application from Bangor Hydro Electric Company for Transmission Line from Orrington, Maine to Pt. Lepreau - NB CA
DOC (27k)
Jan 17, 2003
Application from Bangor Hydro Electric Company for Transmission Line Series Compensation from Orrington, Maine to Maxcys Substation
DOC (27.5k)
Jan 22, 2003
Application from Central Maine Power Company for 30 Myar Switched Shunt Capacitor at Gulf Island Substation
DOC (525k)
Jan 22, 2003
Application from Central Maine Power Company for 30 Myar Switched Shunt Capacitor at Kimball Road Substation
DOC (964k)
Jan 22, 2003
Application from Central Maine Power Company for MY DCT SPS (NPCC #141, Type 1)
DOC (30k)
May 02, 2006
System Conditions for July and August 2006 (MW)
PDF (81.9k)
May 02, 2006
Scheduling and Dispatch of External Transactions - Revision 6
DOC (128k)
May 02, 2006
Scheduling and Dispatch of External Transactions - Revision 6
DOC (147k)
May 02, 2006
Revision 4
DOC (74k)
Apr 24, 2006
Generation Maintenance and Outage Scheduling
DOC (185k)
May 02, 2006
Generation Maintenance and Outage Scheduling
PPT (500k)
Apr 24, 2006
Global Changes throughout Operating Procedures
DOC (33.5k)
Apr 24, 2006
Central Dispatch Operating Responsibility and Authority of ISO New England, the Local Control Centers and Market Participants - Revision 4 in preparation of ASM Phase II
DOC (40k)
Apr 14, 2006
Central Dispatch Operating Responsibility and Authority of ISO New England, the Local Control Centers and Market Participants - Revision 4 in preparation of ASM Phase II
DOC (43k)
Apr 24, 2006
Transmission Outage Scheduling - Revision 5 in preparation of ASM Phase II
DOC (241k)
Apr 24, 2006
Transmission Outage Scheduling - Revision 5 in preparation of ASM Phase II
DOC (279k)
Apr 24, 2006
Action During a Capacity Deficiency - Revision 7 in preparation of ASM Phase II
DOC (61.5k)
Apr 24, 2006
Action During a Capacity Deficiency - Revision 7 in preparation of ASM Phase II
DOC (74k)


  Copyright ©2008 ISO New England Inc.