Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.
| Date |
Document Title |
Document Type |
|
| Apr 13, 2006 |
Application from Northeast Utilities (Public Service Company of New Hampshire) to install a new 345-kV circuit breaker at PSNH's Deerfield Substation in series with the existing 851 circuit breaker |
 |
PDF (33.9k) |
|
| Apr 17, 2006 |
Application from Northeast Utilities to install a new 115kV circuit breaker and relaying work at Dooley 30K substation - Includes cover letter |
 |
PDF (287k) |
|
| Mar 10, 2003 |
For the Northeast Reliability Interconnect Project |
 |
DOC (20k) |
|
| Apr 18, 2006 |
Cover letter from Jeffrey Fenn, PE, SGC Engineering for Bangor Hydro Electric to Don Gates, Chairman, NEPOOL Reliability Committee |
 |
DOC (30.5k) |
|
| Jun 08, 2004 |
Cover letter from Rob Bennett, General Manager, T&D Assets, Bangor Hydro Electric Co. to Mr. Steve Rourke, NEPOOL Reliability Committee |
 |
DOC (20k) |
|
| Jul 28, 2004 |
Northeast Reliability Interconnect Project - Letter from Stephen G. Whitley, Senior Vice President and COO to Rob Bennett, General Manager, T&D Assets, Bangor Hydro Electric Co. |
 |
PDF (3.5Mb) |
|
| Apr 18, 2006 |
Application from Bangor Hydro Electric Co. for the project known as the Northeast Reliability Interconnect |
 |
DOC (46.5k) |
|
| Jan 17, 2003 |
Application from Bangor Hydro Electric Company for Transmission Line from Orrington, Maine to Pt. Lepreau - NB CA |
 |
DOC (27k) |
|
| Jan 17, 2003 |
Application from Bangor Hydro Electric Company for Transmission Line Series Compensation from Orrington, Maine to Maxcys Substation |
 |
DOC (27.5k) |
|
| Jan 22, 2003 |
Application from Central Maine Power Company for 30 Myar Switched Shunt Capacitor at Gulf Island Substation |
 |
DOC (525k) |
|
| Jan 22, 2003 |
Application from Central Maine Power Company for 30 Myar Switched Shunt Capacitor at Kimball Road Substation |
 |
DOC (964k) |
|
| Jan 22, 2003 |
Application from Central Maine Power Company for MY DCT SPS (NPCC #141, Type 1) |
 |
DOC (30k) |
|
| May 02, 2006 |
System Conditions for July and August 2006 (MW) |
 |
PDF (81.9k) |
|
| May 02, 2006 |
Scheduling and Dispatch of External Transactions - Revision 6 |
 |
DOC (128k) |
|
| May 02, 2006 |
Scheduling and Dispatch of External Transactions - Revision 6 |
 |
DOC (147k) |
|
| May 02, 2006 |
Revision 4 |
 |
DOC (74k) |
|
| Apr 24, 2006 |
Generation Maintenance and Outage Scheduling |
 |
DOC (185k) |
|
| May 02, 2006 |
Generation Maintenance and Outage Scheduling |
 |
PPT (500k) |
|
| Apr 24, 2006 |
Global Changes throughout Operating Procedures |
 |
DOC (33.5k) |
|
| Apr 24, 2006 |
Central Dispatch Operating Responsibility and Authority of ISO New England, the Local Control Centers and Market Participants - Revision 4 in preparation of ASM Phase II |
 |
DOC (40k) |
|
| Apr 14, 2006 |
Central Dispatch Operating Responsibility and Authority of ISO New England, the Local Control Centers and Market Participants - Revision 4 in preparation of ASM Phase II |
 |
DOC (43k) |
|
| Apr 24, 2006 |
Transmission Outage Scheduling - Revision 5 in preparation of ASM Phase II |
 |
DOC (241k) |
|
| Apr 24, 2006 |
Transmission Outage Scheduling - Revision 5 in preparation of ASM Phase II |
 |
DOC (279k) |
|
| Apr 24, 2006 |
Action During a Capacity Deficiency - Revision 7 in preparation of ASM Phase II |
 |
DOC (61.5k) |
|
| Apr 24, 2006 |
Action During a Capacity Deficiency - Revision 7 in preparation of ASM Phase II |
 |
DOC (74k) |
|