Reliability Committee Materials
May 2, 2006
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Apr 24, 2006
Generator and Dispatchable Asset Related Demand Maintenance and Outage Scheduling - Revision 7 in preparation of ASM Phase II
DOC (141k)
Apr 24, 2006
Generator and Dispatchable Asset Related Demand Maintenance and Outage Scheduling - Revision 7 in preparation of ASM Phase II
DOC (187k)
Apr 24, 2006
Operating Reserve and Regulation - Revision 4 in preparation of ASM Phase II
DOC (73k)
Apr 24, 2006
Operating Reserve and Regulation - Revision 4 in preparation of ASM Phase II
DOC (95.5k)
Apr 24, 2006
Standards for Voltage Reduction and Load Shedding Capability - Revision 4 in preparation of ASM Phase II
DOC (57.5k)
Apr 24, 2006
Standards for Voltage Reduction and Load Shedding Capability - Revision 4 in preparation of ASM Phase II
DOC (64k)
Apr 24, 2006
Technical Requirements for Generators, Demand Resources and Assett Related Demands - Revision 11 in preparation of ASM Phase II
DOC (149k)
Apr 24, 2006
Technical Requirements for Generators, Demand Resources and Assett Related Demands - Revision 11 in preparation of ASM Phase II
DOC (208k)
Apr 24, 2006
Load Power Factor Correction - Revision 4 in preparation of ASM Phase II
DOC (84.5k)
Apr 24, 2006
Load Power Factor Correction - Revision 4 in preparation of ASM Phase II
DOC (93k)
Apr 24, 2006
Metering and Telemetering Criteria - Revision 7 in preparation of ASM Phase II
DOC (122k)
Apr 24, 2006
Metering and Telemetering Criteria - Revision 7 in preparation of ASM Phase II
DOC (144k)
Jan 17, 2005
From Hydro Quebec TransEnergie and National Grid
PPT (2.1Mb)
Mar 30, 2006
Memo from the OP18 Work Group to the ISO-NE Reliability Committee
DOC (34k)
Mar 22, 2006
Filed by Washington Electric Cooperative, Inc. for Coventry LFGTE
PDF (302k)
Apr 14, 2006
And Modifications to Large Generator Interconnection Procedures and Agreement - Docket Nos. ER06-191-000, ER06-191-001, ER06-193-000 and ER06-193-001
DOC (83.5k)
May 02, 2006
And Approval Process (I.3.9) with the LGIP Timeline and Process for Generator Interconnections
DOC (26k)
Apr 14, 2006
Order on Small Generator Interconnection Compliance Filing and Modifications to Large Generator Interconnection Procedures and Agreement
DOC (29k)
Mar 23, 2006
From the 2006 RC/TC Summer Meeting Planning Committee to the Reliability and Transmission Committees
DOC (186k)
May 26, 2006
To question posed during the April Reliability Committee Meeting
PDF (81.9k)
Mar 01, 2006 PDF (2.0Mb)
Mar 01, 2006 PDF (1.7Mb)
Apr 17, 2006
Cover letter from Jeffrey Fenn, PE, SGC Engineering for BHE to Don Gates, Chairman, NEPOOL Reliability Committee
DOC (39k)
Apr 17, 2006
Cover letter from Jeffrey Fenn, PE, SGC Engineering for BHE to Don Gates, Chairman, NEPOOL Reliability Committee
DOC (40k)
Apr 14, 2006
Transmission Facilities Proposed Plan Analysis prepared by John P. McLaughlin, System Planning, NSTAR Electric & Gas
PDF (117k)


  Copyright ©2008 ISO New England Inc.