Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.
| Date |
Document Title |
Document Type |
|
| Apr 24, 2006 |
Generator and Dispatchable Asset Related Demand Maintenance and Outage Scheduling - Revision 7 in preparation of ASM Phase II |
 |
DOC (141k) |
|
| Apr 24, 2006 |
Generator and Dispatchable Asset Related Demand Maintenance and Outage Scheduling - Revision 7 in preparation of ASM Phase II |
 |
DOC (187k) |
|
| Apr 24, 2006 |
Operating Reserve and Regulation - Revision 4 in preparation of ASM Phase II |
 |
DOC (73k) |
|
| Apr 24, 2006 |
Operating Reserve and Regulation - Revision 4 in preparation of ASM Phase II |
 |
DOC (95.5k) |
|
| Apr 24, 2006 |
Standards for Voltage Reduction and Load Shedding Capability - Revision 4 in preparation of ASM Phase II |
 |
DOC (57.5k) |
|
| Apr 24, 2006 |
Standards for Voltage Reduction and Load Shedding Capability - Revision 4 in preparation of ASM Phase II |
 |
DOC (64k) |
|
| Apr 24, 2006 |
Technical Requirements for Generators, Demand Resources and Assett Related Demands - Revision 11 in preparation of ASM Phase II |
 |
DOC (149k) |
|
| Apr 24, 2006 |
Technical Requirements for Generators, Demand Resources and Assett Related Demands - Revision 11 in preparation of ASM Phase II |
 |
DOC (208k) |
|
| Apr 24, 2006 |
Load Power Factor Correction - Revision 4 in preparation of ASM Phase II |
 |
DOC (84.5k) |
|
| Apr 24, 2006 |
Load Power Factor Correction - Revision 4 in preparation of ASM Phase II |
 |
DOC (93k) |
|
| Apr 24, 2006 |
Metering and Telemetering Criteria - Revision 7 in preparation of ASM Phase II |
 |
DOC (122k) |
|
| Apr 24, 2006 |
Metering and Telemetering Criteria - Revision 7 in preparation of ASM Phase II |
 |
DOC (144k) |
|
| Jan 17, 2005 |
From Hydro Quebec TransEnergie and National Grid |
 |
PPT (2.1Mb) |
|
| Mar 30, 2006 |
Memo from the OP18 Work Group to the ISO-NE Reliability Committee |
 |
DOC (34k) |
|
| Mar 22, 2006 |
Filed by Washington Electric Cooperative, Inc. for Coventry LFGTE |
 |
PDF (302k) |
|
| Apr 14, 2006 |
And Modifications to Large Generator Interconnection Procedures and Agreement - Docket Nos. ER06-191-000, ER06-191-001, ER06-193-000 and ER06-193-001 |
 |
DOC (83.5k) |
|
| May 02, 2006 |
And Approval Process (I.3.9) with the LGIP Timeline and Process for Generator Interconnections |
 |
DOC (26k) |
|
| Apr 14, 2006 |
Order on Small Generator Interconnection Compliance Filing and Modifications to Large Generator Interconnection Procedures and Agreement |
 |
DOC (29k) |
|
| Mar 23, 2006 |
From the 2006 RC/TC Summer Meeting Planning Committee to the Reliability and Transmission Committees |
 |
DOC (186k) |
|
| May 26, 2006 |
To question posed during the April Reliability Committee Meeting |
 |
PDF (81.9k) |
|
| Mar 01, 2006 |
|
 |
PDF (2.0Mb) |
|
| Mar 01, 2006 |
|
 |
PDF (1.7Mb) |
|
| Apr 17, 2006 |
Cover letter from Jeffrey Fenn, PE, SGC Engineering for BHE to Don Gates, Chairman, NEPOOL Reliability Committee |
 |
DOC (39k) |
|
| Apr 17, 2006 |
Cover letter from Jeffrey Fenn, PE, SGC Engineering for BHE to Don Gates, Chairman, NEPOOL Reliability Committee |
 |
DOC (40k) |
|
| Apr 14, 2006 |
Transmission Facilities Proposed Plan Analysis prepared by John P. McLaughlin, System Planning, NSTAR Electric & Gas |
 |
PDF (117k) |
|