Reliability Committee Materials
Dec 18, 2008
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Dec 17, 2008
Agenda (revision 1) and Motions for Consideration (revision 1).
ZIP (45.5k)
Dec 08, 2008
Materials regarding OP18 Appendix C requirements.
ZIP (1.6Mb)
Dec 11, 2008
Report supporting NSTAR-07-T12 Rev 1 (password-protected).
ZIP (4.4Mb)
Dec 11, 2008
Materials to support BHE's TCA.
ZIP (1.3Mb)
Dec 11, 2008
Materials to support NU's TCA.
ZIP (411k)
Dec 15, 2008
For Grand Ave, Union Ave, Sherwood Road and Barnstable SVC.
ZIP (252k)
Dec 15, 2008
For Ingersoll Rand and UNH-Rochester.
ZIP (113k)
Dec 16, 2008
Including recommendations for agenda items 3.1 and 3.3; presentation on the MN TCA (4.2), a memo and spreadsheet reporting reactive capability testing updates (8.0).
ZIP (375k)
Dec 17, 2008
Presentation for Keene Road TCA (agenda item 4.1) and the RIG replacement project (agenda item 7.0). (Password-protected).
ZIP (2.0Mb)
Dec 17, 2008
Supporting presentation.
ZIP (3.2Mb)
Dec 18, 2008
Reposted and revised reports for agenda item 3.1.
ZIP (512k)
Dec 09, 2008
NU's supporting studies and PPA materials (password-protected).
ZIP (1.7Mb)
Dec 09, 2008
UI's supporting studies (password-protected).
ZIP (1.9Mb)
Dec 09, 2008
Supporting materials for proposed plans.
ZIP (235k)
Dec 10, 2008
Proposed revision to OP2 Appendix A.
ZIP (72.5k)
Dec 15, 2008
For BHE's Keene Road, VELCO's Southern Loop and NEP's Merrimack Valley-North Shore projects.
ZIP (2.7Mb)
Dec 17, 2008
Presentations for the TCAs for the Southern Loop Project and the Merrimack-North Shore Projects (re-posted). (Password-protected)
ZIP (2.5Mb)
Dec 17, 2008
Materials for Barnstable Substation and Dartmouth Power. (Re-posted)
ZIP (1.2Mb)
  Copyright ©2009 ISO New England Inc.