Reliability Committee Materials
Jan 16, 2008
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Jan 09, 2008 DOC (88k)
Jan 02, 2008
Studies in support of Braintree's proposed Thomas A. Watson generators in Massachusetts.
ZIP (1.3Mb)
Jan 09, 2008
Supporting materials for Watson PPA (item 3.1), BHE's Downeast TCA (4.1), NU's Glenbrook Cables TCA (4.2), NEP's Lynn PPA (6.1), and BHE's Pine Tree Landfill notification (6.2)
ZIP (5.7Mb)
Jan 09, 2008
Presentation & report to summarize 2007 reactive capability testing (agenda item 7.0); Draft revisions of PP 5-1 (agenda item 5.1)
ZIP (244k)
Jan 11, 2008
Materials for FCM maintenance allotments (agenda item 10.0) and transmission outage process changes (agenda item 11.0)
ZIP (2.4Mb)
Jan 11, 2008
Motions for Consideration, Load Forecast presentation (agenda item 8.0) and Draft Minutes (agenda item 2.0) and letter supporting the Watson generation (agenda item 3.1)
ZIP (254k)
Jan 11, 2008
Cover letters for the Downeast Reliability TCA Application (agenda item 4.1) and Pine Tree Landfill (agenda item 6.2)
ZIP (236k)
Jan 15, 2008
Material provided at NRG's request for agenda item 10.0.
ZIP (42.4k)
Jan 15, 2008
Revised forecast (agenda item 8.0)
ZIP (169k)
  Copyright ©2009 ISO New England Inc.