Reliability Committee Materials
Jun 17, 2008
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Jun 17, 2008
Agenda Revision 1, Motions for Consideration Revision 2, Task Force Letters
ZIP (201k)
Jun 03, 2008
Studies supporting the NU plans for double circuit tower reconfigurations in CT.
ZIP (1.8Mb)
Jun 17, 2008
Reports supporting proposed plans for new generation in Billerica, MA (password-protected report).
ZIP (3.4Mb)
Jun 09, 2008
Supporting materials for Billerica Energy Center, 368/310 & 368/1767 DCT Reconfigurations, and Maine Power Reliability Project (MPRP)
ZIP (1.5Mb)
Jun 11, 2008
Supporting materials for revisions to OP1 and OP3; and presentations on 80 kA design, Regulation pilot and NYISO-ISONE Coordination Agreement (replaced version posted earlier).
ZIP (875k)
Jun 11, 2008
Supporting materials for agenda items 5.1 through 5.5.
ZIP (746k)
Jun 09, 2008
Supporting materials for NSTAR-04-TCA-T04 Revision 3.
ZIP (88.1k)
Jun 16, 2008
CMP's plans (some re-submitted and re-posted) for the Maine Power Reliability Project and NU's supporting plans in NH
ZIP (5.1Mb)
Jun 12, 2008
Task force letter for CMP's and NU's plans for the MPRP and NSTAR's Level I PPA for a transformer replacement in Falmouth.
ZIP (345k)
Jun 20, 2008
MPRP Presentation (re-posted after the meeting, for agenda item 2.3), GE notification (5.7), and voltage reduction test results.
ZIP (2.5Mb)
  Copyright ©2009 ISO New England Inc.