Reliability Committee Materials
Jun 17, 2008
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.
| Date |
Document Title |
Document Type |
|
| Jun 17, 2008 |
Agenda Revision 1, Motions for Consideration Revision 2, Task Force Letters |
 |
ZIP (201k) |
|
| Jun 03, 2008 |
Studies supporting the NU plans for double circuit tower reconfigurations in CT. |
 |
ZIP (1.8Mb) |
|
| Jun 17, 2008 |
Reports supporting proposed plans for new generation in Billerica, MA (password-protected report). |
 |
ZIP (3.4Mb) |
|
| Jun 09, 2008 |
Supporting materials for Billerica Energy Center, 368/310 & 368/1767 DCT Reconfigurations, and Maine Power Reliability Project (MPRP) |
 |
ZIP (1.5Mb) |
|
| Jun 11, 2008 |
Supporting materials for revisions to OP1 and OP3; and presentations on 80 kA design, Regulation pilot and NYISO-ISONE Coordination Agreement (replaced version posted earlier). |
 |
ZIP (875k) |
|
| Jun 11, 2008 |
Supporting materials for agenda items 5.1 through 5.5. |
 |
ZIP (746k) |
|
| Jun 09, 2008 |
Supporting materials for NSTAR-04-TCA-T04 Revision 3. |
 |
ZIP (88.1k) |
|
| Jun 16, 2008 |
CMP's plans (some re-submitted and re-posted) for the Maine Power Reliability Project and NU's supporting plans in NH |
 |
ZIP (5.1Mb) |
|
| Jun 12, 2008 |
Task force letter for CMP's and NU's plans for the MPRP and NSTAR's Level I PPA for a transformer replacement in Falmouth. |
 |
ZIP (345k) |
|
| Jun 20, 2008 |
MPRP Presentation (re-posted after the meeting, for agenda item 2.3), GE notification (5.7), and voltage reduction test results. |
 |
ZIP (2.5Mb) |
|