Reliability Committee Materials
Mar 18, 2008
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.
| Date |
Document Title |
Document Type |
|
| Mar 14, 2008 |
Revision 2 |
 |
DOC (89.5k) |
|
| Mar 11, 2008 |
Supporting materials for Level I PPAs and Level 0 Generator Notifications (agenda items 7.1 through 7.6) |
 |
ZIP (1.0Mb) |
|
| Mar 11, 2008 |
Supporting materials for revisions to PP 9 (agenda item 2.1) and OP 4 (agenda item 4.1) |
 |
ZIP (311k) |
|
| Mar 14, 2008 |
Zip 4a Revised Motions for Consideration; presentation on local sourcing and max capacity limits calculations for FCM (agenda item 8.2) |
 |
ZIP (155k) |
|
| Mar 12, 2008 |
Supporting materials for agenda items 3.1, 3.2, 5.1, 5.2 and 6.1 |
 |
ZIP (4.5Mb) |
|
| Mar 12, 2008 |
NU's response to questions from RC and ISO-NE regarding TCA (agenda item 3.1) |
 |
ZIP (7.0Mb) |
|
| Mar 13, 2008 |
Presentation on upcoming Planning Procedure 10 changes (agenda item 2.2) and on Glenbrook Cables TCA (3.1) |
 |
ZIP (152k) |
|
| Mar 14, 2008 |
Presentation on Northwest Vermont Reliability Project (agenda item 3.2), presentation on FCA-1 results (8.1) and supporting diagram for BHE-08-T01 (7.2) |
 |
ZIP (2.1Mb) |
|