Reliability Committee Materials
Mar 18, 2008
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Mar 14, 2008
Revision 2
DOC (89.5k)
Mar 11, 2008
Supporting materials for Level I PPAs and Level 0 Generator Notifications (agenda items 7.1 through 7.6)
ZIP (1.0Mb)
Mar 11, 2008
Supporting materials for revisions to PP 9 (agenda item 2.1) and OP 4 (agenda item 4.1)
ZIP (311k)
Mar 14, 2008
Zip 4a Revised Motions for Consideration; presentation on local sourcing and max capacity limits calculations for FCM (agenda item 8.2)
ZIP (155k)
Mar 12, 2008
Supporting materials for agenda items 3.1, 3.2, 5.1, 5.2 and 6.1
ZIP (4.5Mb)
Mar 12, 2008
NU's response to questions from RC and ISO-NE regarding TCA (agenda item 3.1)
ZIP (7.0Mb)
Mar 13, 2008
Presentation on upcoming Planning Procedure 10 changes (agenda item 2.2) and on Glenbrook Cables TCA (3.1)
ZIP (152k)
Mar 14, 2008
Presentation on Northwest Vermont Reliability Project (agenda item 3.2), presentation on FCA-1 results (8.1) and supporting diagram for BHE-08-T01 (7.2)
ZIP (2.1Mb)
  Copyright ©2009 ISO New England Inc.