Reliability Committee Materials
Nov 21, 2008
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.
| Date |
Document Title |
Document Type |
|
| Nov 20, 2008 |
Agenda (revision 2) motions for consideration (revision 1), 2009 proposed meeting schedule, and draft minutes. |
 |
ZIP (81.6k) |
|
| Nov 07, 2008 |
(password-protected) |
 |
ZIP (3.4Mb) |
|
| Nov 18, 2008 |
For plans in agenda items 3.1, 3.2 and 3.3. |
 |
ZIP (219k) |
|
| Nov 20, 2008 |
Presentation (password-protected) |
 |
ZIP (2.2Mb) |
|
| Nov 21, 2008 |
Presentation, redlined (re-posted) and clean drafts. |
 |
ZIP (176k) |
|
| Nov 21, 2008 |
Presentation for BHE-08-TCA-01 (Password-protected). |
 |
ZIP (2.5Mb) |
|
| Nov 07, 2008 |
(password-protected) |
 |
ZIP (519k) |
|
| Nov 07, 2008 |
|
 |
ZIP (451k) |
|
| Nov 10, 2008 |
(password-protected) |
 |
ZIP (3.8Mb) |
|
| Nov 17, 2008 |
For Stetson Mountain Wind Phase II/Rollins Wind in ME, Middletown Units #12-15 in CT, and Keene Road/MPRP in ME. |
 |
ZIP (1.9Mb) |
|
| Nov 18, 2008 |
TCAs for Lower SEMA Project, with PPAs and I.3.9 letter added |
 |
ZIP (883k) |
|
| Nov 17, 2008 |
Presentation on FCA-2 assumptions (5.0) and Memo on timetable for stakeholder process (6.1) |
 |
ZIP (315k) |
|
| Nov 19, 2008 |
Agenda items 6.2 and 6.3 (re-posted on 11/19) |
 |
ZIP (531k) |
|
| Nov 18, 2008 |
PPAs and Notifications for agenda items 7.1 through 7.7 |
 |
ZIP (1.1Mb) |
|