Reliability Committee Materials
Nov 21, 2008
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Nov 20, 2008
Agenda (revision 2) motions for consideration (revision 1), 2009 proposed meeting schedule, and draft minutes.
ZIP (81.6k)
Nov 07, 2008
(password-protected)
ZIP (3.4Mb)
Nov 18, 2008
For plans in agenda items 3.1, 3.2 and 3.3.
ZIP (219k)
Nov 20, 2008
Presentation (password-protected)
ZIP (2.2Mb)
Nov 21, 2008
Presentation, redlined (re-posted) and clean drafts.
ZIP (176k)
Nov 21, 2008
Presentation for BHE-08-TCA-01 (Password-protected).
ZIP (2.5Mb)
Nov 07, 2008
(password-protected)
ZIP (519k)
Nov 07, 2008 ZIP (451k)
Nov 10, 2008
(password-protected)
ZIP (3.8Mb)
Nov 17, 2008
For Stetson Mountain Wind Phase II/Rollins Wind in ME, Middletown Units #12-15 in CT, and Keene Road/MPRP in ME.
ZIP (1.9Mb)
Nov 18, 2008
TCAs for Lower SEMA Project, with PPAs and I.3.9 letter added
ZIP (883k)
Nov 17, 2008
Presentation on FCA-2 assumptions (5.0) and Memo on timetable for stakeholder process (6.1)
ZIP (315k)
Nov 19, 2008
Agenda items 6.2 and 6.3 (re-posted on 11/19)
ZIP (531k)
Nov 18, 2008
PPAs and Notifications for agenda items 7.1 through 7.7
ZIP (1.1Mb)
  Copyright ©2009 ISO New England Inc.