Reliability Committee Materials
Oct 15, 2008
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.
| Date |
Document Title |
Document Type |
|
| Oct 14, 2008 |
Agenda (Revision 2), Motions for Consideration, draft minutes and proposed 2009 meeting schedule |
 |
ZIP (72.2k) |
|
| Oct 02, 2008 |
Materials for NEP-08-T61, plans for Devens switching station in Ayer, MA (password-protected). |
 |
ZIP (365k) |
|
| Oct 09, 2008 |
Agenda items 4.1 through 4.3 and 5.0: TCAs for Scobie Pond-Hudson Corridor, Trumbull 45 P Substation, Maxcy's-Bucksport SPS; QRR for Waterside |
 |
ZIP (1.2Mb) |
|
| Oct 14, 2008 |
Materials supporting agenda items 6.1 thru 6.5; (corrected Indeck one-line for item 6.1) |
 |
ZIP (1.1Mb) |
|
| Oct 09, 2008 |
Agenda item 9.0: Presentation and reference listing of transmission projects |
 |
ZIP (253k) |
|
| Oct 09, 2008 |
Agenda item 3.2 |
 |
ZIP (153k) |
|
| Oct 09, 2008 |
Presentation on July 24 disturbance (password-protected) |
 |
ZIP (359k) |
|
| Oct 09, 2008 |
Agenda item 7.0 |
 |
ZIP (590k) |
|
| Oct 10, 2008 |
Material for agenda item 4.2 (password-protected) |
 |
ZIP (594k) |
|
| Oct 14, 2008 |
Announcement for 11/12-11/13 workshop in Mystic, CT |
 |
ZIP (43.2k) |
|