In this section

Constraints

Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
April 18, 2024 04/17/2024 12:41 PM EDT CSV
April 17, 2024 04/16/2024 12:52 PM EDT CSV
April 16, 2024 04/15/2024 12:47 PM EDT CSV
April 15, 2024 04/14/2024 12:04 PM EDT CSV
April 14, 2024 04/13/2024 12:22 PM EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 04/17/2024 10:10 PM EDT CSV
April 16, 2024 04/16/2024 11:55 PM EDT CSV
April 15, 2024 04/15/2024 10:50 PM EDT CSV
April 14, 2024 04/14/2024 11:55 PM EDT CSV
April 13, 2024 04/13/2024 11:50 PM EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/18/2024 01:21 AM EDT CSV
April 17, 2024 04/17/2024 11:21 PM EDT CSV
April 16, 2024 04/16/2024 11:21 PM EDT CSV
April 15, 2024 04/15/2024 11:21 PM EDT CSV
April 14, 2024 04/14/2024 11:21 PM EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/17/2024 01:53 PM EDT CSV
April 15, 2024 04/16/2024 02:53 PM EDT CSV
April 14, 2024 04/15/2024 03:06 PM EDT CSV
April 13, 2024 04/15/2024 02:12 PM EDT CSV
April 12, 2024 04/15/2024 11:43 AM EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/17/2024 01:53 PM EDT CSV
April 15, 2024 04/16/2024 02:53 PM EDT CSV
April 14, 2024 04/15/2024 03:06 PM EDT CSV
April 13, 2024 04/15/2024 02:12 PM EDT CSV
April 12, 2024 04/15/2024 11:43 AM EDT CSV