In this section

Constraints

Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
April 26, 2024 04/25/2024 12:20 PM EDT CSV
April 25, 2024 04/24/2024 12:28 PM EDT CSV
April 24, 2024 04/23/2024 12:24 PM EDT CSV
April 23, 2024 04/22/2024 01:15 PM EDT CSV
April 22, 2024 04/21/2024 12:43 PM EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 04/25/2024 07:25 PM EDT CSV
April 24, 2024 04/24/2024 11:55 PM EDT CSV
April 23, 2024 04/23/2024 11:55 PM EDT CSV
April 22, 2024 04/22/2024 11:00 PM EDT CSV
April 21, 2024 04/21/2024 11:55 PM EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/25/2024 07:21 PM EDT CSV
April 24, 2024 04/24/2024 11:21 PM EDT CSV
April 23, 2024 04/23/2024 11:21 PM EDT CSV
April 22, 2024 04/22/2024 11:21 PM EDT CSV
April 21, 2024 04/21/2024 11:21 PM EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/25/2024 01:28 PM EDT CSV
April 23, 2024 04/24/2024 01:24 PM EDT CSV
April 22, 2024 04/23/2024 02:26 PM EDT CSV
April 21, 2024 04/22/2024 03:32 PM EDT CSV
April 20, 2024 04/22/2024 03:24 PM EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/25/2024 01:28 PM EDT CSV
April 23, 2024 04/24/2024 01:24 PM EDT CSV
April 22, 2024 04/23/2024 02:26 PM EDT CSV
April 21, 2024 04/22/2024 03:32 PM EDT CSV
April 20, 2024 04/22/2024 03:24 PM EDT CSV