Under Installed Capacity (ICAP), generators are paid for siting units in New England based on the net capacity the unit provides after adjustments to account for forced outages at the unit. The adjusted product is called Unforced Capacity, or UCAP.
| Date |
Document Title |
Document Type |
|
| May 07, 2008 |
Summary, by month, of the amount of available Import Rights for Installed Capacity (ICAP) on each of the external import interfaces. The spreadsheet will be updated periodically as ICAP import rights availability |
 |
XLS (144k) |
|
| Apr 29, 2008 |
A summary of the Annual System Peak Day, Hour and Load MW values for the various Power Years. |
 |
XLS (85k) |
|
| Jun 19, 2007 |
A summary of the Forcasted Peak Loads, Installed Capacity Requirements and Reserve Margins for the Power Year June 1, 2007 through May 31, 2008. |
 |
PDF (20.1k) |
|
| May 30, 2007 |
This document describes procedures associated with Hydro Quebec Interconnection Credits (HQICCs) for the 2007 - 2008 Power Year - how HQICCs are assigned and, if necessary, adjusted. |
 |
DOC (77k) |
|