Schedule 22 - Standard Large Generator Interconnection Procedures
Provides the terms and conditions for interconnecting Large Generating Facilities (more than 20 MW) to the Administered Transmission System.
Date Document Title Document Type
Jan 24, 2010 PDF (1.2Mb)
  Copyright ©2010 ISO New England Inc.