Schedule 22 - Standard Large Generator Interconnection Procedures
Provides the terms and conditions for interconnecting Large Generating Facilities (more than 20 MW) to the Administered Transmission System.
| Date | Document Title | Document Type | |
| Mar 24, 2008 | PDF (1.0Mb) | ||