ISO New England Planning Procedures
As the Regional Transmission Organization (RTO), ISO-NE is responsible for transmission planning and sets requirements for participants regarding reliability standards, pooled transmission facility cost review and notice of intent to change facilities.
Date Document Title Document Type
Apr 20, 2011
Planning Procedure to Support the Forward Capacity Market
PDF (592k)
Dec 10, 2010
Procedure for Review of Governance Participant's Proposed Plans (Section I.3.9 Applications: Requirements, Procedures and Forms)
PDF (408k)
Sep 24, 2010 DOC (924k)
Sep 17, 2010
Correlation Table
XLS (27.5k)
Sep 17, 2010
Project Cost Estimating Guidelines
PDF (297k)
Sep 17, 2010
Procedure for Pool-Supported PTF Cost Review
PDF (178k)
Sep 17, 2010
Procedures for Determining and Implementing Transmission Facility Ratings in New England
PDF (767k)
Sep 17, 2010
TCA Application Form
XLS (142k)
Aug 17, 2010
This document provides information on the operating characteristics of transmission system elements, such as Phase Shifting Transformers (PST), located throughout the ISO New England control area.
PDF (133k)
Aug 10, 2010
Scope of Study for System Impact Studies Under the Generation Interconnection Procedures
PDF (49.0k)
Jul 29, 2010 DOC (671k)
Mar 05, 2010
Guidelines for Conducting and Evaluating Proposed Plan Application Analysis
PDF (246k)
Mar 05, 2010
Reliability Standards for the New England Area Bulk Power Supply System
PDF (148k)
Jun 22, 2009
Special Protection Systems Application Guidelines
PDF (83.6k)
Jun 05, 2009
Procedure for Reporting Notice of Intent to Construct or Change Facilities in Accordance with Section I.3.9 of the ISO New England Tariff (Proposed Plan Application Procedure)
PDF (44.7k)