ISO New England Planning Procedures
As the Regional Transmission Organization (RTO), ISO-NE is responsible for transmission planning and sets requirements for participants regarding reliability standards, pooled transmission facility cost review and notice of intent to change facilities.
| Date |
Document Title |
Document Type |
| Apr 20, 2011 |
Planning Procedure to Support the Forward Capacity Market |
 |
PDF (592k) |
| Dec 10, 2010 |
Procedure for Review of Governance Participant's Proposed Plans (Section I.3.9 Applications: Requirements, Procedures and Forms) |
 |
PDF (408k) |
| Sep 24, 2010 |
|
 |
DOC (924k) |
| Sep 17, 2010 |
Correlation Table |
 |
XLS (27.5k) |
| Sep 17, 2010 |
Project Cost Estimating Guidelines |
 |
PDF (297k) |
| Sep 17, 2010 |
Procedure for Pool-Supported PTF Cost Review |
 |
PDF (178k) |
| Sep 17, 2010 |
Procedures for Determining and Implementing Transmission Facility Ratings in New England |
 |
PDF (767k) |
| Sep 17, 2010 |
TCA Application Form |
 |
XLS (142k) |
| Aug 17, 2010 |
This document provides information on the operating characteristics of transmission system elements, such as Phase Shifting Transformers (PST), located throughout the ISO New England control area. |
 |
PDF (133k) |
| Aug 10, 2010 |
Scope of Study for System Impact Studies Under the Generation Interconnection Procedures |
 |
PDF (49.0k) |
| Jul 29, 2010 |
|
 |
DOC (671k) |
| Mar 05, 2010 |
Guidelines for Conducting and Evaluating Proposed Plan Application Analysis |
 |
PDF (246k) |
| Mar 05, 2010 |
Reliability Standards for the New England Area Bulk Power Supply System |
 |
PDF (148k) |
| Jun 22, 2009 |
Special Protection Systems Application Guidelines |
 |
PDF (83.6k) |
| Jun 05, 2009 |
Procedure for Reporting Notice of Intent to Construct or Change Facilities in Accordance with Section I.3.9 of the ISO New England Tariff (Proposed Plan Application Procedure) |
 |
PDF (44.7k) |