ISO New England Planning Procedures
As the Regional Transmission Organization (RTO), ISO-NE is responsible for transmission planning and sets requirements for participants regarding reliability standards, pooled transmission facility cost review and notice of intent to change facilities.
| Date |
Document Title |
Document Type |
| Feb 14, 2007 |
Report of the Ad Hoc Line Trap Rating Procedure Working Group of the System Design Task Force Dated June 1990 |
 |
PDF (229k) |
| Feb 14, 2007 |
Procedures for Determining and Implementing Transmission Facility Ratings in New England |
 |
PDF (612k) |
| Apr 14, 2006 |
Ambient Temperatures and Wind Velocity for Rating Calculations |
 |
PDF (102k) |
| Apr 14, 2006 |
Analysis of Wind-Temperature Data and Effect on Current-Carrying Capacity of Overhead Conductors |
 |
PDF (952k) |
| Apr 14, 2006 |
Old Capacity Ratings Procedures |
 |
PDF (294k) |
| May 27, 2005 |
|
 |
DOC (15k) |
| Feb 01, 2005 |
Cost Responsibility for Transmission Upgrades with Multiple Needs
|
 |
DOC (49.5k) |
| Feb 01, 2005 |
Subordinate Proposed Plan Application Policy |
 |
DOC (44.5k) |
| Feb 01, 2005 |
Construction Sequencing |
 |
DOC (56.5k) |