Compliance Interpretations
Includes Compliance Aids intended to Assist Market Participants in their Compliance Obligations with Respect to NERC Reliability Standards.
| Date |
Document Title |
Document Type |
| Jan 08, 2010 |
Acceptable Corroborating Evidence: "Determination of Inclusion in the Metered Boundaries of ISO-NE for Generator Operators, Transmission Operators and Load-Serving Entities Operating in the Balancing Authority's Area." |
 |
PDF (221k) |
| Jan 08, 2010 |
Acceptable Corroborating Evidence: "Deficient Load-Serving Entities Are Not Required to Request the Reliability Coordinator to Initate an Energy Emergency Alert in New England." |
 |
PDF (207k) |
| Jan 08, 2010 |
Acceptable Corroborating Evidence: "All New England Customers Must Purchase Schedule 2 'Reactive Supply and Voltage Control from Generation Source Service', per ISO-NE Tariff, II.4." |
 |
PDF (86.2k) |
| Jan 08, 2010 |
Acceptable Corroborating Evidence: "Standards Pertaining to Dynamic Scheduling Do Not Apply in New England at This Time" |
 |
PDF (206k) |
| Jan 08, 2010 |
Acceptable Corroborating Evidence: "Reliability Directives Issued by the Reliability Coordinator Are Not Applicable to Load-Serving Entities, Purchasing-Selling Entities or Transmission Service Providers in New England." |
 |
PDF (210k) |
| Jan 08, 2010 |
Acceptable Corroborating Evidence: "Standards Pertaining to Under Voltage Load Shedding Programs Do Not Apply in New England at This Time" |
 |
PDF (207k) |