Current Status |
|||||
| Report Name |
Change Summary |
Effective Date |
Description |
Template |
Sample |
|
SD_RTUNITOP |
Existing. Renamed the columns "Constrained for RMR" to "Constrained for LSCPR" and "RMR Reliability Region" to "LSCPR Reliability Region". Modified the description of columns "Constrained for LSCPR" and "LSCPR Reliability Region" |
02.11.2009 | XLTX | CSV | |
SD_RTUNITOP - Real Time Audit Unit Operations Report - Rev 7SD_RTUNITOP_<customer id>_<settlement date>_<version>.CSV Availability: Daily between 16:15 and 18:15 or on-demand by Settlement need. |
|
|
REPORT COLUMN |
DESCRIPTION |
|
Trading Interval |
Specific hour for which the information is reported. Numeric from 1 - 24 (For daylight-saving crossover days: the long day extra hour = 02X, the short day removes hour 02). |
|
Asset ID |
Numerical identifier for the asset. |
|
Asset Name |
Name of the asset. |
|
Asset Sub Type |
|
|
Location ID |
Location Identification Number. |
|
Location Name |
Location Name. |
|
Location Type |
Node, Zone, or Hub. |
|
Constrained for SCR Support |
Flagged as Special Constraint Resource. |
|
Constrained for VAR Support |
Flagged to provide VAR up/down support. |
|
Constrained for LSCPR |
Flagged to provide Local Second Contingency Protection support for a Reliability Region. |
|
Must Run |
Flagged for Must Run. |
|
LSCPR Reliability Region |
Flagged for LSCPR.. |
|
Following DDP |
Y (Yes) N (No) as defined in MR 1 and Manuals. |
|
Economic Min (Bid) |
Lowest unrestricted level of Energy, in MW, of a Customer's Generating Unit as bid in. |
|
Economic Min (Dispatched) |
Lowest unrestricted level of Energy, in MW, of a Customer's Generating Unit as used in Real Time. |
|
Economic Min (NCPC) |
This is the Min of the Mins from the Eligibility Application which is the minimum of the DA Schedule Economic Min, RT Schedule Economic Min and the Actual Economic Min (as dispatched). |
|
Economic Max (Bid) |
Highest unrestricted level of Energy, in MW, of a Customer's Generating Unit as bid in. |
|
Economic Max (Dispatched) |
Highest unrestricted level of Energy, in MW, of a Customer's Generating Unit as used in Real Time. |
|
Self Schedule Deviation |
The difference between the Revenue Quality Meter Reading and Cleared Day Ahead MWs for Self Scheduled units. |
|
Not Following Dispatch Deviation |
The difference between the Revenue Quality Meter Reading and Desired Dispatched Point for Pool Scheduled units. |
|
Generation (Metered) |
Revenue Quality Meter Reading. |
|
Desired Dispatch Point (NCPC) |
The control signal expressed in MWs transmitted to Generation resources. |
|
Implicit Self Scheduled Regulation MWs |
Regulation Output Level for a Unit that is Partially Self Scheduled for Regulation for the Hour. |

