SD_VARCEPPMT
OATT Schedule 2 - VAR Cost of Energy Produced Payment

Current Status

Report Name

Change Summary

Effective Date

Description

Template

Sample

sd_varceppmt

Existing. 01.01.2008 PDF XLTX CSV

 

SD_VARCEPPMT – OATT Schedule 2 – VAR Cost of Energy Produced Payment Report – VAR CEP Payment – Rev 0

SD_VARCEPPMT_<customer id>_<settlement date>_<version>.CSV
Date: mm/dd/yyyy and Version: mm/dd/yyyy hh:mm:ss GMT
Availability: Monthly

REPORT COLUMN

DESCRIPTION

Day

Specific day for which the data is reported in form MM/DD/YYYY

Trading Interval

Specific hour for which the information is reported. Numeric from 1 – 24 (For daylight-saving crossover days: the long day extra hour = 02X, the short day removes hour 02).

Asset ID

Numerical identifier for the asset

Asset Name

Name of the asset.

Asset Type

Specified asset type such as:

  • GENERATOR
  • NON-GENERATOR

Energy Produced

Total energy in consumed by asset

Energy Rate

Payment rate for consuming one MW

Cost of Energy Produced Credits

Cost of Energy Produced Credits = Energy Produced x Energy Rate

Allocation Share

Customer's ownership share of the asset

Customer Share of Cost of Energy Produced Credits

Total Cost of Energy Produced payment to the customer for this asset and trading interval

  Copyright ©2014 ISO New England Inc.