sp_araresult
Annual Reconfiguration Auction Result

Current Status

Report Name

Change Summary

Effective Date

Description

Template

Sample

sp_araresult
SP_ARARESULT - Annual Reconfiguration Auction Result Report - Rev 0

Existing. This report will be distributed to participant by end of May 2009. 06.10.2010 PDF XLTX CSV

 

SP_ARARESULT - Annual Reconfiguration Auction Result Report - Rev 0

SP_ARARESULT_customer id_commitment period begin_version.CSV
Commitment_Period_Begin: mm/dd/yyyy and Version: mm/dd/yyyy hh:mm:ss GMT

Availability: Upon auction approval, this report is published to Participants who have submitted supply offers or demand bids in the annual reconfiguration auction.

REPORT COLUMN

DESCRIPTION

Tab 1 (Resources)

Resource ID

Numerical identifier for the Resource.

Resource Name

Name of the Resource.

Resource Type

The FCM Resource Type. Appropriate values are: Generator, Demand and Import.

Resource Subtype

The FCM Resource Subtype, if applicable. Appropriate values are:

  • Generator: Intermittent
  • Demand: RT Emergency Generation
  • Import: Grandfathered

Capacity Zone ID

The numerical identifier of the Capacity Zone to which the Resource is interconnected for the Forward Capacity Market.

Capacity Zone Name

The name of the Capacity Zone to which the Resource is interconnected for the Forward Capacity Market.

External Interface Name

The name of the External Interface.

Start Date

Start date of the Capacity Commitment Period for which the auction was run.

End Date

End date of the Capacity Commitment Period for which the auction was run.

Supply Offer / Demand Bid

The MW amount submitted for a specific Supply Offer or Demand Bid.

Offer / Bid Type

The type of transaction submitted. Valid types are: OFFER, BID

Cleared MW

The total MW cleared for the transaction.

  • Cleared MW with Supply Offer / Demand Bid type = OFFER is reported as a positive value.
  • Cleared MW with Supply Offer / Demand Bid type = BID is reported as a negative value.

Rejected for Reliability Flag

Indicator to identify whether or not the transaction was accepted. Valid types are: Y or Null

Rejection Reason

The reason the transaction was rejected

Clearing Price

The Clearing Price in $/kW-Month for the specific Annual Reconfiguration Auction for the specific Capacity Zone or External Interface.

Reconfiguration Auction Charge/Credit

The amount in $/Month that the Lead Participant will be credited or charged, calculated as the product of the Cleared MW and the Clearing Price. Charges are reported as negative values.

Tab 2 (Capacity Zone)

Capacity Zone ID

The numerical identifier of the Capacity Zone in which an offer or bid for the Resource cleared in the Annual Reconfiguration Auction.

Capacity Zone Name

The name of the Capacity Zone in which an offer or bid for the Resource cleared

Capacity Zone Type

The type of the Capacity Zone to which the Resource is interconnected for the Forward Capacity Market. Valid types are:

  • Import
  • Export
  • Rest of Pool

Start Date

Start date of the Capacity Commitment Period for which the auction was run

End Date

End date of the Capacity Commitment Period for which the auction was run

Total Supply Offers Submitted

The total MW offered into the Annual Reconfiguration Auction for the specific Capacity Zone.

Total Demand Bids Submitted

The total MW bid into the Annual Reconfiguration Auction for the specific Capacity Zone. 

Total Supply Offers Cleared

The total Supply Offers MW cleared in the Annual Reconfiguration Auction for the specific Capacity Zone.

Total Demand Bids Cleared

The total Demand Bid MW cleared in the Annual Reconfiguration Auction for the specific Capacity Zone. Total Demand Bids Cleared is reported as a negative value.

Net Capacity Cleared

Represents value in MW derived as the sum of Total Supply Offers Cleared and Total Demand Bids Cleared

ISO Supply Offer

The total MW ISO New England offered into the Annual Reconfiguration Auction for the specific Capacity Zone.

ISO Demand Bid

The total MW ISO New England bid into the Annual Reconfiguration Auction for the specific Capacity Zone.

ISO Supply Offer Cleared

The total cleared MW ISO New England offered into the Annual Reconfiguration Auction for the specific Capacity Zone.

ISO Demand Bid Cleared

The total cleared MW ISO New England bid into the Annual Reconfiguration Auction for the specific Capacity Zone.

Clearing Price

The Clearing Price in $/kW-Month for the specific Annual Reconfiguration Auction for the specific Capacity Zone.

Tab 3 (External Interface)

External Interface Name

The name of the External Interface.

Capacity Zone ID

The numerical identifier of the Capacity Zone to which the Resource is interconnected for the Forward Capacity Market.

Capacity Zone Name

The name of the Capacity Zone to which the Resource is interconnected for the Forward Capacity Market.

External Control Area

The name of the External Control Area.

Start Date

Start date of the Capacity Commitment Period for which the auction was run

End Date

End date of the Capacity Commitment Period for which the auction was run

Total Supply Offers Submitted

The total MW offered into the Annual Reconfiguration Auction for the specific External Interface.

Total Demand Bids Submitted

The total MW bid into the Annual Reconfiguration Auction for the specific External Interface.

Total Supply Offers Cleared

The total Supply Offers MW cleared in the Annual Reconfiguration Auction for the specific External Interface.

Total Demand Bids Cleared

The total Demand Bids MW cleared in the Annual Reconfiguration Auction for the specific External Interface. Total Demand Bids Cleared is reported as a negative value.

Net Capacity Cleared

Represents value in MW derived as the sum of the Total Supply Offers Cleared and Total Demand Bids Cleared for the specific External Interface

ISO Supply Offer

The total MW ISO New England offered into the Annual Reconfiguration Auction for the specific External Interface.

ISO Supply Offer Cleared

The total cleared MW ISO New England offered into the Annual Reconfiguration Auction for the specific External Interface.

Clearing Price

The Clearing Price in $/kW-Month for the specific Annual Reconfiguration Auction for the specific External Interface.

Tab 4 (Control Area)

Start Date

Start date of the Capacity Commitment Period for which the auction was run

End Date

End date of the Capacity Commitment Period for which the auction was run

Total Supply Offers Submitted

The total MW offered into the Annual Reconfiguration Auction for the Control Area.

Total Supply Offers Cleared

The total Supply Offers MW cleared in the Annual Reconfiguration Auction for the Control Area.

Total Demand Bids Submitted

The total MW bid into the Annual Reconfiguration Auction for the Control Area.

Total Demand Bids Cleared

The total Demand Bids MW cleared in the Annual Reconfiguration Auction for the Control Area. Total Demand Bids Cleared is reported as a negative value.

Net Capacity Cleared

Represents value in MW derived as the sum of Total Supply Offers Cleared and Total Demand Bids Cleared for the Control Area.

Total ISO Supply Offer

The total MW ISO New England offered into the Annual Reconfiguration Auction for the Control Area.

Total ISO Demand Bid

The total MW ISO New England bid into the Annual Reconfiguration Auction for the Control Area.

Total ISO Supply Offers Cleared

The total ISO New England Supply Offers MW cleared in the Annual Reconfiguration Auction for the Control Area

Total ISO Demand Bids Cleared

The total ISO New England Demand Bids MW cleared in the Annual Reconfiguration Auction for the Control Area.

  Copyright ©2014 ISO New England Inc.