sp_projectedshareicr
Projected Share-Installed Capacity Requirement

Current Status

Report Name

Change Summary

Effective Date

Description

Template

Sample

sp_projectedshareicr Modified. Section "Capacity Zone" new column "Capacity Zone Peak Contributions". The first version of this report may be released the end of this year or early next year for Capacity Commitment Period June 2015. 06.01.2015 PDF XLTX CSV

View Archived Status at the foot of this page

 

 

SP_PROJECTEDSHAREICR – Projected Share – Installed Capacity Requirement Report – Rev 0

SP_PROJECTEDSHAREICR_<customer id>_<commitment period begin>_<version>.CSV
<Customer Name>
Commitment_Period_Begin: mm/dd/yyyy and Version: mm/dd/yyyy hh:mm:ss GMT
Availability: 3 weeks prior to Self-Supply designation deadline.

REPORT COLUMN

DESCRIPTION

Tab 1 (Capacity Zone)

Capacity Zone ID

Numerical identifier for Capacity Zone in which the asset is electrically connected through a Load Zone

Capacity Zone Name

Name of Capacity Zone in which the asset is electrically connected through a Load Zone

Capacity Zone Projected ICR

Projected Share of Installed Capacity Requirement for Capacity Zone (MW).

Customer Share of Capacity Zone Projected ICR

Customer’s Projected Share of Installed Capacity Requirement for Capacity Zone (MW).

Capacity Zone Peak Contributions

The total Peak Contributions of all load and Dispatchable Asset Related Demand assets in the Capacity Zone for the subject Capacity Commitment Period.
The Capacity Zone Peak Contributions are from the calendar year ending December 31 of the year prior to the reference date*.

Tab 2 (Load)

Asset ID

Numerical identifier for the asset (Load asset or Asset Related Demand).

Asset Name

Name of the asset.

Asset Type

Type of asset (Load or Asset Related Demand).

Capacity Zone ID

Numerical identifier for Capacity Zone in which the asset is electrically connected through a Load Zone

Capacity Zone Name

Name of Capacity Zone, in which the asset is electrically connected through a Load Zone

Peak Contribution MW

Load Asset's contribution to peak day and hour of demand for the associated Capacity Zone (as of reference date*).

Ownership Share

A right or obligation to a percentage share of all Credits or Charges associated with Load asset (as of reference date*).

Customer Share of Peak Contribution MW

Customer's Share of Load Asset's contribution to peak day and hour of demand for the associated Capacity Zone (as of reference date*).

Note: The Capacity Zone Projected ICR values are for determining the total quantity of capacity that a load serving entity may designate for self-supply only and calculated pursuant to ISO-NE Market Rules and Manuals. The Capacity Zone Projected ICR values shown in this report are based on preliminary ICR values for the subject Capacity Commitment Period and will not necessarily be the same as those used when determining a Market Participant’s actual capacity requirements during the Capacity Commitment Period.
*Reference date is the first day of the month prior to the report issuance date.

Archived Status

Report Name

Change Summary

Effective Date

sp_projectedshareicr Existing. 06.01.2010