ss_dancpclscprmrr
Day-Ahead Multiple Reliability Region LSCPR Charge Allocation

Current Status

Report Name

Change Summary

Effective Date

Description

Template

Sample

ss_dancpclscprmrr Modified. No change in report structure. “Allocation Description” and “Total Allocation Factor” are now based on Real-Time Load Obligation (RTLO) instead of Day-Ahead Load Obligation (DALO). “Customer Allocation Factor” is now based on RTLO, excluding RTLO associated with Postured Dispatchable Asset Related Demand Resource (pumps only). 01.23.2014 PDF XLTX CSV

 

SS_DANCPCLSCPRMRR – NCPC – Day-Ahead Multiple Reliability Region LSCPR Charge Allocation – Rev 1

SS_DANCPCLSCPRMRR_<customer id>_<settlement date>_<version>.CSV
Date: mm/dd/yyyy and Version: mm/dd/yyyy hh:mm:ss GMT
Availability: Determined by associated market service

REPORT COLUMN

DESCRIPTION

CALCULATION

Trading Date

Specific day for which the settlement(s) is calculated.

Location ID

Numerical identifier of the Reliability Region for which the customer was charged for Day-Ahead NCPC LSCPR in the Day-Ahead NCPC settlement.

Location Name

Name of the location corresponding to the Location ID.

Customer Dollars

The amount charged for Day-Ahead NCPC LSCPR in the Day-Ahead NCPC settlement for the reliability region.

Comments

This column will contain “Refund for Day-Ahead LSCPR Charges”.

ALLOCATION

Trading Date

Specific day for which the settlement is calculated.

Location ID

Numerical identifier of the Reliability Region for which the customer is being charged for Day-Ahead NCPC LSCPR.

Location Name

 Name of the location corresponding to the Location ID.

Allocation Description

This column will contain “Daily RTLO per Reliability Region”.

Total Allocation Factor

Total RTLO for the Reliability Region for the day.

Customer Allocation Factor

Customer’s Real-Time Load Obligation for the Reliability Region per Appendix F, excluding Real-Time Load Obligation associated with Postured Dispatchable Asset Related Demand Resource (pumps only) per Appendix F, and including Real-Time Load Obligation associated with Capacity Export Through Import Constrained Zone Transactions or FCA Cleared Export Transactions per Appendix F.

Total Dollars

Total dollars to be allocated for Day-Ahead NCPC LSCPR charges for the Reliability Region for the day.

Customer Dollars

Total Dollars x Customer Allocation Factor / Total Allocation Factor

Comments

This column will contain “Day-Ahead LSCPR Commitments”.

 

Archive Status

Report Name

Change Summary

Effective Date

ss_dancpclscprmrr New. The first version of this report will be posted on January 3rd 2012 for Operating Day January 1st 2012 only if multiple Reliability Regions are flagged for LSCPR (Local Second Contingency Protection Resource) on that day; otherwise the report will be posted accordingly when the next operating day triggers this flagging. 01.01.2012
  Copyright ©2014 ISO New England Inc.