ww_varstatus
OATT Schedule 2_VAR Status Summary

Current Status

Report Name

Change Summary

Effective Date

Description

Template

Sample

ww_varstatus Modified. Column name change from "Last Leading Test Date" to "Leading Status Effective Date" and from "Last Lagging Test Date" to "Lagging Status Effective Date". The first version of this report will be posted during the second week of January 2012 for obligation month January 2012 following the distribution of report "sd_varccpmt" for obligation month January 2012. 01.01.2012 PDF XLTX CSV
Access VAR Summary Status Data

View Archived Status at the foot of this page

 

WW_VARSTATUS_ISO – OATT Schedule 2– VAR Status Summary Report

WW_VARSTATUS_ISO_settlement date_version.CSV
Date: mm/dd/yyyy and Version: mm/dd/yyyy hh:mm:ss GMT
Availability: Monthly after Capacity Cost Calculation (Payment) job run.

REPORT COLUMN

DESCRIPTION

Asset ID

Numerical identifier for the asset

Asset Name

Name of the asset.

Asset Type

Specified asset type such as:

  • GENERATOR
  • NON-GENERATOR

Leading Status Effective Date

Effective date of the Leading status.

Leading Test Due Date

Due date of the leading test

Schedule 2 Leading Program Status

Status of the asset in the leading VAR program

Lagging Status Effective Date

Effective date of the Lagging status.

Lagging Test Due Date

Due date of the lagging test

Schedule 2 Lagging Program Status

Status of the asset in the lagging VAR program

Lagging Test MW Level

MW level of the lagging test

Lagging Qualified VAR Capability

Lagging qualified VAR capability of the asset

Leading Qualified VAR Capability

Leading qualified VAR capability of the asset

Total Qualified VARs

Total qualified VAR capability of the asset

 

Archived Status

Report Name

Change Summary

Effective Date

ww_varstatus Existing 01.01.2008
  Copyright ©2014 ISO New England Inc.