Report Descriptions, Templates & Samples
An alphabetical listing of ISO-NE reports and related information.

Report Type Key

Report Type Description

ad

Adjustment Detail

au

Audit

bl

Bill Detail

fa

Financial Assurance

fi

Forecast Information

oi

Operation Information

sd

Settlement Details

sp

Special

sr

Settlement Report

ss

Standard Settlement

tr

Tariff Report

ww

World Wide Web

Report Name Change Summary
Effective Date

Description

Template
Sample
This information represents the report type and abbreviated name for the applicable report. This information represents the most recent change detail for the applicable report. This information represents the date that corresponds to the most recent change detail for the applicable report. This portable document format (pdf) or Web page (html) contains the most recent definition of each column contained within the applicable report. This Excel template (xltx) contains the generic format and structure for the applicable report. This portable document format (pdf) or comma-separated value (csv) file contains example data that a customer may receive from the ISO within the applicable report.
 
All Reports Existing. This document contains the most recent of all report descriptions. An Archived Market Information Server Tracking Table is also included. Effective Immediately.
This document contains the most recent of all report descriptions as of the last MIS report notice distributed by the ISO
PDF ZIP ZIP
Information Supporting All Reports Existing. This document contains the most recent of information supporting all reports. Effective Immediately.
This primarily static document contains the most recent of report supporting detail, e.g. file naming convention and retention.
PDF Not available Not available
ad_rmrregion Existing. 01.01.2001 HTML XLTX CSV

bl_dailyposition

Modified. No change in report structure, Regulation Market will include the "Make Whole" credits and charges. 07.01.2013 HTML XLTX CSV
bl_details Existing. Added a new section "Standard Settlement Details". 03.01.2008 HTML XLTX CSV
bl_invoice Existing. 01.01.2001 HTML XLTX CSV
bl_pmtdefault New.  The first version of this report may be issued any time after 01.25.2011. 01.25.2011 HTML XLTX CSV
bl_print_invoice Existing. 12.01.2005 PDF PDF PDF
bl_print_remittance Existing. 12.01.2005 PDF PDF PDF
bl_shortfall New.  The first version of this report may be issued any time after 01.25.2011. 01.25.2011 HTML XLTX CSV
fa_ftrpreawdreq Modified. “Auction Name” will be reported in the report heading instead of auction period. 10.09.2012 HTML XLTX CSV
fi_rtdispetimport Modified. 06.01.2010 HTML XLTX CSV
fi_unitoper Existing. 01.01.2001 HTML XLTX CSV
oi_claim1030startnotification New. The first version of this report is expected no earlier than June 2, 2013 reflecting fast start capable assets that received a startup instruction for the previous operating day. 06.01.2013 HTML XLTX CSV
oi_daextrans Existing. 01.01.2001 HTML XLTX CSV
oi_lossesmd Existing. 01.01.2001 HTML XLTX CSV
oi_meter Modified. "NORWALK TIE" renamed "NNC TIE". 02.01.2012 HTML XLTX CSV
oi_unitoper Existing. 01.01.2001 HTML XLTX CSV
oi_unitrtrsv Existing. 10.01.2006 HTML XLTX CSV
oi_weeklyclaim1030 New. The first version of this report is expected no earlier than May 30, 2013 reflecting Claim 10 and Claim 30 values to be effective the following Monday through Sunday. 06.01.2013 HTML XLTX CSV
sd_arrawdsum Modified. No change in report structure. In addition to the auction period, the auction round will be reported in the "Market Name" column. 10.09.2012 HTML XLTX CSV
sd_arrsum Modified. No change in report structure. In addition to the auction period, the auction round will be reported in the "Market Name" column. 10.09.2012 HTML XLTX CSV
sd_arrtransact Modified. No change in report structure. In addition to the auction period, the auction round will be reported in the "Market Name" column. 10.09.2012 HTML XLTX CSV
sd_blackstartcharge Retired. This report will be issued for any resettlements for any obligation month prior to 01.01.2013. 01.01.2013 HTML XLTX CSV
sd_blackstartpayment Retired. This report will be issued for any resettlements for any obligation month prior to 01.01.2013. 01.01.2013 HTML XLTX CSV
sd_bscapitalpmt Modified. Added new columns "Subaccount ID" and "Subaccount Name" in the "Summary", "Standard Capital", "Specified-Term Capital" and "CIP Capital" sections. 05.21.2014 HTML XLTX CSV
sd_bscharge Modified. Added new columns "Subaccount ID" and "Subaccount Name". 05.21.2014 HTML XLTX CSV
sd_bsequipdamage Modified. Added new columns "Subaccount ID" and "Subaccount Name". 05.21.2014 HTML XLTX CSV
sd_bsnondbrscpmt Modified. Added new columns "Subaccount ID" and "Subaccount Name". 05.21.2014 HTML XLTX CSV
sd_bsoperations Modified. Added new columns "Subaccount ID" and "Subaccount Name". 05.21.2014 HTML XLTX CSV
sd_bsopmaintpmt Modified. Added new columns "Subaccount ID" and "Subaccount Name" in the "Summary", "O+M", and "CIP O+M" sections. 05.21.2014 HTML XLTX CSV
sd_bsstandardratepmt Modified. Added new columns "Subaccount ID" and "Subaccount Name" in the "Standard Rate Payment" section. 05.21.2014 HTML XLTX CSV
sd_bsstationspecific Modified. Added new columns "Subaccount ID" and "Subaccount Name" in the "Summary" section. 05.21.2014 HTML XLTX CSV
sd_dacleared Existing. 01.01.2001 HTML XLTX CSV
sd_dancpcpayment Modified. No change in report structure, added type of SCR in the description of "NCPC Type". 04.01.2013 HTML XLTX CSV
sd_datransact Modified. Added new columns "Subaccount ID" and "Subaccount Name" to the "External Transactions" and "Internal Transactions" sections. 05.21.2014 HTML XLTX CSV
sd_daunitop Existing. Renamed the columns "Constrained for RMR" to "Constrained for LSCPR" and "RMR Reliability Region" to "LSCPR Reliability Region". Modified the Description of the columns, " Constrained for LSCPR" and "LSCPR Reliability Region"
02.11.2009 HTML XLTX CSV
sd_drchgdetail Modified. Added new "Subaccount" section. 05.21.2014 HTML XLTX CSV
sd_drstldetail Modified. Added new columns "Subaccount ID" and "Subaccount Name" in the "RTDR Asset" and "RTEG Asset" sections. 05.21.2014 HTML XLTX CSV

sd_fcmavail

New. 06.01.2010 HTML XLTX CSV

sd_fcmclostldtl

Modified. Added new column "Pool CTR Fund Credit" to Pool section.
Added new columns "Capacity Zone CTR Fund", "Capacity Zone Specifically Allocated CTR for Pool Planned Units", "Capacity Zone Specifically Allocated CTR Credit for Pool Planned Units", "Capacity Zone Specifically Allocated CTR for Transmission Upgrade", "Capacity Zone Specifically Allocated CTR Credit for Transmission Upgrade", "Capacity Zone Residual CTR Fund", "Capacity Zone Residual CTR Fund Distribution Allocation MW" to the Capacity Zone section. Added new columns "Customer Specifically Allocated CTR for Pool Planned Units", "Customer Specifically Allocated CTR Credit for Pool Planned Units", "Customer Specifically Allocated CTR for Transmission Upgrade", "Customer Specifically Allocated CTR Credit for Transmission Upgrade", "Customer Specifically Allocated CTR Credit", "Customer Residual CTR Fund Distribution Allocation MW", "Customer Residual CTR Fund Credit", "Customer CTR Credit" to the Customer section.

Added new section "PPU Specifically Allocated CTR".

06.01.2012 HTML XLTX CSV

sd_fcmdardncba

Modified. In section "Asset Hourly" columns "Nominated Consumption Limit MW", "Day-Ahead Bid Min Consumption Limit MW", "Performance Min Consumption Limit MW", and "Non-Conforming Min Consumption Limit MW" have been removed. This report will be issued only if there is a Dispatch ARD registered into the system. 06.01.2011 HTML XLTX CSV

sd_fcmimportpenaltychg

New. 06.01.2010 HTML XLTX CSV

sd_fcmimportpenaltycrd

This report is expected to be released following the settlement obligation month. 06.01.2010 HTML XLTX CSV

sd_fcmmthreqlaowner

This report is expected to be released following the settlement obligation month. 06.01.2010 HTML XLTX CSV

sd_fcmnscdtl

New. 06.01.2010 HTML XLTX CSV

sd_fcmperformstldtl

Modified. New section "Hourly Locational Dispatch Deviations" will appear with the initial settlement of September 2010 (report released in October prior to monthly services bill) and all resettlements as of June 2010. 09.01.2010 HTML XLTX CSV
sd_fcmpreavail New. This report will be published only if there is a shortage event declared in an obligation month. 06.01.2010 HTML XLTX CSV
sd_fcmprecapreq Modified. New tab "DARD Peak Contributions" may contain data effective with obligation month Oct 1st 2010 going forward. This tab will contain just report headers for an obligation month prior to Oct. 1st 2010. 10.01.2010 HTML XLTX CSV

sd_fcmreliabilitydtl

New. 06.01.2010 HTML XLTX CSV
sd_fcmresstldtl New. 06.01.2010 HTML XLTX CSV
sd_ftrlt Modified. New column "Auction Name" will be reported beginning with the approval of Round 1 of the 2013 Annual FTR Auction. 10.09.2012 HTML XLTX CSV
sd_ftrmth New.  Auction bid data received by the ISO from participants for the Monthly FTR Auction. The first generation of the report will be distributed no earlier than March 25, 2011 for the months of January 2011 - April 2011. 01.01.2011 HTML XLTX CSV
sd_hrftr Existing. 01.01.2001 HTML XLTX CSV
sd_lrbaseline Retired. This report will be issued for any resettlements for any obligation month prior to 06.01.2012. 06.01.2012 HTML XLTX CSV
sd_lrprelimdtl Retired. This report will be issued for any resettlements for any obligation month prior to 06.01.2012. 06.01.2012 HTML XLTX CSV
sd_lrstldetail Retired. This report will be issued for any resettlements for any obligation month prior to 06.01.2012. 06.01.2012 HTML XLTX CSV
sd_monthlyepoh Modified. New column in Resource section entitled "Cumulative EPOH Exemption". This new column will be reported for both the initial settlement effective June 1st 2011 and any resettlements prior to June 1st 2011. 06.01.2011 HTML XLTX CSV
sd_mtftr Existing. 01.01.2001 HTML XLTX CSV
sd_mthreqicaplaowner Retired. 12.01.2006 HTML XLTX CSV
sd_mthstlicap Retired. 06.01.2010 HTML XLTX CSV
sd_regdtl New. The first version of this report will be released for settlement of operating day 05.21.2014. 05.21.2014 HTML XLTX CSV
sd_regdtlasm Modified. Updated descriptions of "Regulation Service Credit" and "Time On Regulation Credit". New columns: "Regulation Service Cost", "Time On Regulation Cost", "Total Regulation Cost", "Regulation Make Whole Cost", "Regulation Payment", and "Customer Share of Make Whole Cost". 07.01.2013 HTML XLTX CSV
sd_rsvastdtl Modified. Added new columns "Subaccount ID" and "Subaccount Name" in the "Asset", "Forward Reserve", "Real-Time Reserve" and "Failure-to-Activate" sections. 05.21.2014 HTML XLTX CSV
sd_rsvtransact Existing. 10.01.2006 HTML XLTX CSV
sd_rtdomain Existing. 01.01.2001 HTML XLTX CSV
sd_rtdresp Retired. 06.01.2005 HTML XLTX CSV
sd_rtload Modified. Added new columns "Subaccount ID" and "Subaccount Name". 05.21.2014 HTML XLTX CSV
sd_rtncpclscpr Modified. A new column has been added following the 'Total RT Reliability Region Daily Load Obligation' column. 06.01.2010 HTML XLTX CSV
sd_rtncpcpmt Modified. No change in report structure, added type of Generator Performance Audit in the description of "NCPC Type".
09.01.2013 HTML XLTX CSV
sd_rtncpcpmtdtl Existing.Modified the description of the columns "Base Daily Total NCPC Credit" and "NCPC Eligible"
02.11.2009 HTML XLTX CSV
sd_rttransact Modified. Added new columns "Subaccount ID" and "Subaccount Name" to the "External Transactions" and "Internal Transactions" sections. 05.21.2014 HTML XLTX CSV
sd_rtunitasm Modified. Added new columns "Subaccount ID" and "Subaccount Name". 05.21.2014 HTML XLTX CSV
sd_rtunitop Existing. Renamed the columns "Constrained for RMR" to "Constrained for LSCPR" and "RMR Reliability Region" to "LSCPR Reliability Region". Modified the description of columns "Constrained for LSCPR" and "LSCPR Reliability Region"
02.11.2009 HTML XLTX CSV
sd_varccchg Existing. 01.01.2008 HTML XLTX CSV
sd_varccpmt Modified. Column name change from "Last Leading Test Date" to "Leading Status Effective Date" and from "Last Lagging Test Date" to "Lagging Status Effective Date". The first version of this report will be posted during the second week of January 2012 for obligation Month January 2012. 01.01.2012 HTML XLTX CSV
sd_varcecpmt Existing. 01.01.2008 HTML XLTX CSV
sd_varceppmt Existing. 01.01.2008 HTML XLTX CSV
sd_varlocpmt Existing. Modified the description of column "Lost Opportunity Cost Credits". 01.01.2008 HTML XLTX CSV
sd_varvcchg Modified. New section "HV VAR VC Charge Details". This new section will only contain the header with no detail data for resettlement of any obligation month prior to Dec. 2010. In addition it will appear on the initial settlement for November 2010 due to the implementation date of the software revisions. Also, added "not related to high voltage conditions" to "Hourly Cost of Energy Produced Credits" column description. 12.01.2010 HTML XLTX CSV
sp_araresult Existing. This report will be distributed to participant by end of May 2009. 06.10.2010 HTML XLTX CSV
sp_dmdrsp Modified. The name of the 'Enrolling Participant ID' column has been renamed. 06.01.2010 HTML XLTX CSV
sp_dmdrspdly Modified. The name of the 'Meter Reader / IBCS Customer ID' column has been renamed. 06.01.2010 HTML XLTX CSV
sp_eqr Modified. No change in report structure. The description for "Customer Company Name" column has been updated. 07.01.2013 HTML Not available CSV, CSV and CSV
sp_eqrlag

Modified. Removed Customer Duns Number column. Added Trade Date, Exchange/Broker Service, Type of Rate, Standardized Price and Standardized Quantity columns to report structure.

07.01.2013 HTML Not available CSV and CSV
sp_existcapqual Existing. Section Generating Capacity Resources, added new column "Adjusted Winter Qualified Capacity". Section Intermittent Power Resources added new column "Adjusted Winter Qualified Capacity" and column "Low Winter Qualified Capacity Indicator" is no longer being used. Section Demand Resources, added new columns "Calculated Summer Seasonal Demand Reduction Value" (at the end), "Calculated Winter Seasonal Demand Reduction Value" (following Calculated Summer Seasonal Demand Reduction Value) and "Adjusted Winter Qualified Capacity" (following Calculated Winter Seasonal Demand Reduction Value). Columns "Maximum Interruptible Capacity" and "Current Adjusted ICAP Resource Capability" are no longer being used. Section "Import Capacity Resources ", added new column "Adjusted Winter Qualified Capacity" (at the end), columns "Capacity Zone Name" and "Capacity Zone ID" are no longer being used. 06.01.0210 HTML XLTX CSV
sp_fcaresult Modified. The definitions of Payment Rate for Capacity Zone (Tab 4) and External Interface (Tab 5) have been changed, effective with the FCA for Capacity Commitment Period 2016-2017. 02.08.2013 HTML XLTX CSV
sp_fcmannualpeak Modified. No changes in report structure, only data change. The "Load Asset Detail" section will include metered MW for Dispatchable or Non Dispatchable(excluding PUMP STORAGE, STATION SERVICE) ARD Assets in addition to Load Assets effective commitment period June 2011 and the CSV file will be posted early 2011 for CP 2011. 06.01.2011 HTML XLTX CSV

sp_meteradj

Existing 01.01.2001 PDF PDF PDF
sp_meterdirect Existing. 03.01.2003 HTML XLTX CSV
sp_meterdomain Existing. 03.01.2003 HTML XLTX CSV
sp_meterprofiled Existing. 03.01.2003 HTML XLTX CSV
sp_mraresult New. The Monthly Reconfiguration Auction Result Report is published to Participants who have submitted supply offers or demand bids in the monthly reconfiguration auction. If an obligation period prior to 06.01.2010 is run, this report is not produced. First anticipated run date will be early 04/2010 for obligation period 06/2010. 06.01.2010 HTML XLTX CSV
sp_peakcontribution New. This is a monthly report which includes daily detail. It will be generated and published on the 86th and 100th day following obligation month. 06.01.2010 HTML XLTX CSV
sp_peakcontributiondly New. This is a monthly report which includes daily details. The First anticipated run date is June 2nd 2010. 06.01.2010 HTML XLTX CSV
sp_projectedshareicr

Modified. Section "Capacity Zone" new column "Capacity Zone Peak Contributions". The first version of this report may be released the end of this year or early next year for Capacity Commitment Period June 2015.

06.01.2015 HTML XLTX CSV
sp_ucappeakcontr Retired. This report will be replaced by the SP_PEAK_CONTRIBUTION report. 06.01.2010 HTML XLTX CSV
sp_ucappeakcontrdly Retired. This report will be replaced by the SP_PEAKCONTRIBUTIONDLY report. 06.01.2010 HTML XLTX CSV
sr_arrdistr Modified. No change in report structure. In addition to the auction period, the auction round will be reported in the "Market Name" column. 10.09.2012 HTML XLTX CSV
sr_blackstartstl Retired. This report will be issued for any resettlements for any obligation month prior to 01.01.2013. 01.01.2013 HTML XLTX CSV
sr_bspaymentsummary Modified. Added new columns "Subaccount ID" and "Subaccount Name". 05.21.2014 HTML XLTX CSV
sr_bssettlementsum Modified. Added new columns "Subaccount ID" and "Subaccount Name". 05.21.2014 HTML XLTX CSV
sr_dacustsum Modified. Added new "Subaccount" section. 05.21.2014 HTML XLTX CSV
sr_dalocsum Modified. Added new "Subaccount" section. 05.21.2014 HTML XLTX CSV
sr_dancpcstlsum Modified. In the Asset LSCPR Charge section, new columns "Real Time Load Obligation per Reliability Region", "RT External Sale Load Obligation MW (CETICZ or FCA Cleared Export)", "Dispatchable ARD Daily RTLO Reduction MWs", "Participant Daily NCPC Real Time Load Obligation" and "Total Daily NCPC Real Time Load Obligation" have been added.  Columns "Day Ahead Load Obligation per Reliability Region", "External Sale Load Obligation MW (CETICZ and FCA Cleared Export)",  "Participant Daily NCPC Day Ahead Load Obligation" and "Total Daily NCPC Day Ahead Load Obligation" will be retired but will be used for resettlements up through 12/31/2013, or later depending on FERC. 01.23.2014 HTML XLTX CSV
sr_drstlsum Modified. Added new "Subaccount" section. 05.21.2014 HTML XLTX CSV
sr_exticaptranpen Existing. Modified the Description of the Report Column "Pool Total UCAP Supply"
06.16.2009 HTML XLTX CSV
sr_fcmannualepoh New.  The first version of this will be issued early June 2011 for CP 2011.  06.01.2011 HTML XLTX CSV

sr_fcmavailsum

New. 06.01.2010 HTML XLTX CSV

sr_fcmnrcpsum

Modified. No change in report structure, only report description change. In the Capacity Zone section, the description of the 'Net Regional Clearing Price Total Credit Adjustment' is now the sum of the Capacity Zone Net Performance Incentive and Capacity Zone Performance Penalty. This change is reflective of a calculation change and will be effective with reports issued beginning with obligation month June 2012. 06.01.2012 HTML XLTX CSV

sr_fcmperformstl

New. 06.01.2010 HTML XLTX CSV

sr_fcmstlsum

Existing. No change in report structure. In Pool section "Pool Residual CTR Fund Credit" and "Pool Specifically Allocated CTR Credit" will be populated effective June 1, 2012. Any resettlement prior to June 1, 2012 will contain null. In Capacity Zone section "Capacity Zone Residual CTR Fund Credit" will be populated effective June 1, 2012. Any resettlement prior to June 1, 2012 will contain null. In Customer section "Customer Residual CTR Fund Credit" and "Customer Specifically Allocated CTR Credit" will be populated effective June 1, 2012. Any resettlement prior to June 1, 2012 will contain null.

06.01.2010 HTML XLTX CSV
sr_lfraresult Modified. New section entitled "Proxy Price". The first version of this report is expected to be distributed late August 2011 for Winter 2011 LFR Auction. 06.01.2011 HTML XLTX CSV
sr_lrlocsum Retired. This report will be issued for any resettlements for any obligation month prior to 06.01.2012. 06.01.2012 HTML XLTX CSV
sr_lrprelimsum Retired. This report will be issued for any resettlements for any obligation month prior to 06.01.2012. 06.01.2012 HTML XLTX CSV
sr_lrstlsum Retired. This report will be issued for any resettlements for any obligation month prior to 06.01.2012. 06.01.2012 HTML XLTX CSV
sr_mthstlicap Retired. 06.01.2010 HTML XLTX CSV
sr_regasm Modified. "Regulation Opportunity Cost Charge" will contain zero values for settlements after June 30, 2013. New columns: "Pool Regulation Make Whole Cost", "Regulation Make Whole Cost", and "Regulation Make Whole Cost Charge". 07.01.2013 HTML XLTX CSV
sr_regsum New. The first version of this report will be released for settlement of operating day 05.21.2014. 05.21.2014 HTML XLTX CSV
sr_rmrregion Existing. 07.01.2003 HTML XLTX CSV
sr_rsvcharge Modified. Miscellaneous edits in Description, added new "Subaccount" and "RT Reserve - Subaccount Detail" sections. 05.21.2014 HTML XLTX CSV
sr_rsvchg Retired. This report will continue to be issued for any resettlements prior to operating day June 1, 2011. 06.01.2011 HTML XLTX CSV
sr_rsvstl Modified. Added new "Subaccount" section. 05.21.2014 HTML XLTX CSV
sr_rsvzonesum Modified. Added new "Subaccount" section. 05.21.2014 HTML XLTX CSV
sr_rtcustsum Modified. Added new "Subaccount" section. 05.21.2014 HTML XLTX CSV
sr_rtdresp Retired. 06.01.2005 HTML XLTX CSV
sr_rtlocsum Modified. Added new "Subaccount" section. 05.21.2014 HTML XLTX CSV
sr_rtncpcstl Modified. In the NCPC Daily Charges section, new columns "Participant Daily Real Time Load Obligation", "Generator Performance Audit DARD Daily Real Time Load Obligation Reduction", "Participant Generator Performance Audit Charge Real Time Load Obligation", "Pool Generator Performance Audit Charge Real Time Load Obligation", "Pool Real Time Generator Performance Audit NCPC Credits", "Participant Real Time Generator Performance Audit NCPC Charge", "Participant Real Time Economic, LSCPR, SCR and Generator Performance Audit NCPC Payment", and "Participant Net Real Time Economic, LSCPR, SCR and Generator Performance Audit NCPC Settlement" have been added. Columns "Participant Real Time Economic, LSCPR, and SCR NCPC Payment" and "Participant Net Real Time Economic, LSCPR, and SCR NCPC Settlement" are retired but will show up for resettlements prior to 09/01/2013. 09.01.2013 HTML XLTX CSV
sr_varstl Existing. 01.01.2008 HTML XLTX CSV
ss_bscip Retired..This report will be issued for any resettlements prior to the operating day January 1, 2013. 01.01.2013 HTML XLTX CSV
ss_dancpclscprmrr Modified. No change in report structure. "Allocation Description" and "Total Allocation Factor" are now based on Real-Time Load Obligation (RTLO) instead of Day-Ahead Load Obligation (DALO). "Customer Allocation Factor" is now based on RTLO, excluding RTLO associated with Postured Dispatchable Asset Related Demand Resource (pumps only). 01.23.2014 HTML XLTX CSV
ss_drrpap Retired. 06.01.2010 HTML XLTX CSV
ss_drrpop4 Retired. 06.01.2010 HTML XLTX CSV
ss_drrppp Retired. 06.01.2010 HTML XLTX CSV
ss_drrpppl Retired. 06.01.2010 HTML XLTX CSV

ss_forfeitedfa

Modified. No changes in report structure, only data change to content within columns entitled "Allocation Description", "Total Dollars", and "Customer Dollars" to reflect summarization by Capacity Zone and "Comments" for allocation detail.  First anticipated report distribution will be no earlier than February 10, 2011. 06.01.2010 HTML XLTX CSV
ss_genericss Existing. This is not an actual report file. This is only a sample generic file showing all columns being populated. It is used as a guide when creating Standard Settlement files. 03.01.2008 HTML XLTX CSV

ss_giscost

New. Standard Settlement Report for GIS Cost. If an obligation period prior to 01/01/2010 is run, the report will not be produced. The migration date for this release is 02/23/2010. First anticipated run date will be around 03/09/2010 for obligation period 01/2010.

01.01.2010

HTML

XLTX

CSV

ss_hvvar Existing. 07.01.2008 HTML XLTX CSV
ss_mlrfee Retired. 06.01.2010 HTML XLTX CSV
ss_ncpccdart Existing. 03.01.2008 HTML XLTX CSV
ss_ncpccs Existing. 03.01.2008 HTML XLTX CSV
ss_ncpcmge Existing. Deleted "Trading Interval" column from the "Allocation" section. 03.01.2008 HTML XLTX CSV
ss_ncpcpg Existing. 03.01.2009 HTML XLTX CSV
ss_ncpcscr Retired. This report will be issued for any resettlements prior to the operating day April 1, 2013. 04.01.2013 HTML XLTX CSV
ss_parexp Existing. This Standard Settlement Participant Expenses report will be available on May 15, 2008. 04.01.2008 HTML XLTX CSV
ss_rteepeet Existing. 03.01.2009 HTML XLTX CSV
ss_rteetca Existing. 03.01.2009 HTML XLTX CSV
ss_rtesep Modified. No change in report structure, only change to revise allocation factor term "Adjusted Load Obligation" to the correct term "Marginal Loss Revenue Load Obligation" in the description text and sample file. 01.01.2011 HTML XLTX CSV
ss_rtncpclscprmrr New. The first version of this report will be posted on January 4th 2012 for Operating Day January 1st 2012 only if multiple Reliability Regions are flagged for LSCPR (Local Second Contingency Protection Resource) on that day; otherwise the report will be posted accordingly when the next operating day triggers this flagging. 01.01.2012 HTML XLTX CSV
ss_wrdrec New. This is a monthly report with hourly detail. The first version of this report is expected no earlier than January 8, 2014. 12.01.2013 HTML XLTX CSV
ss_wrdrep New. The first version of this report is expected no earlier than February 1, 2014. 12.01.2013 HTML XLTX CSV
ss_wrdrmp New. The first version of this report is expected no earlier than February 1, 2014. 12.01.2013 HTML XLTX CSV
ss_wrdrmc New. The first version of this report is expected no earlier than January 8, 2014. 12.01.2013 HTML XLTX CSV
ss_wrdrnpc New. The first version of this report is expected no earlier than February 1, 2014. 12.01.2013 HTML XLTX CSV
ss_wrdrnpp New. The first version of this report is expected no earlier than February 1, 2014. 12.01.2013 HTML XLTX CSV
ss_wrgendpc New. The first version of this report is expected no earlier than February 1, 2014. 12.01.2013 HTML XLTX CSV
ss_wrgendpp New. The first version of this report is expected no earlier than February 1, 2014. 12.01.2013 HTML XLTX CSV
ss_wrgenmc New. The first version of this report is expected no earlier than January 8, 2014. 12.01.2013 HTML XLTX CSV
ss_wrgenmp New. The first version of this report is expected no earlier than February 1, 2014. 12.01.2013 HTML XLTX CSV
ss_wrgenpbpc New. The first version of this report is expected no earlier than February 1, 2014. 12.01.2013 HTML XLTX CSV
ss_wrgenpbpp New. The first version of this report is expected no earlier than February 1, 2014. 12.01.2013 HTML XLTX CSV
ss_wrncpcdfst New. The first version of this report may be issued anytime after 10.27.2013. 10.22.2013 HTML XLTX CSV
tr_isosch1rns Modified. Section "Charges" updated column to "Regional Network Load ID" from "Network Load ID"; to "DUNS Number" from "Duns Number"; to "DUNS Name" from "Duns Name"; to "Regional Network Load Name" from "Network Load Name"; to "Pool Monthly Regional Network Load Value" from "Pool Network Load Value" with corresponding subheading updated to "kW-Month" from "kW"; to "Monthly Regional Network Load Value" from "Network Load Value" with corresponding subheading updated to "kW-Month" from "kW". These changes take effect immediately upon implementation for any settlement or resettlement. The first version of this report is expected with the June 2011 resettlement and the September 2011 initial settlement, both distributed after October 20th, 2011. Effective Immediately HTML XLTX CSV
tr_isosch5rns Modified. Section "Charges" updated column to "Regional Network Load ID" from "Network Load ID"; to "DUNS Number" from "Duns Number"; to "DUNS Name" from "Duns Name"; to "Regional Network Load Name" from "Network Load Name"; to "Pool Monthly Regional Network Load Value" from "Pool Network Load Value" with corresponding subheading updated to "kW-Month" from "kW"; to "Monthly Regional Network Load Value" from "Network Load Value" with corresponding subheading updated to "kW-Month" from "kW". These changes take effect immediately upon implementation for any settlement or resettlement. The first version of this report is expected with the June 2011 resettlement and the September 2011 initial settlement, both distributed after October 20th, 2011. Effective Immediately HTML XLTX CSV
tr_isosch1tout Modified. Section "Charges" updated column to "DUNS Name" from "Duns Name"; to "MWh" from "MW" for "Reservation Amount" column sub-heading. Section "Payments" updated column to "Regional Network Load Value" from "Network Load Value"; to "Pool Regional Network Load Value" from "Network Load Value". Section "Detail" updated column to "DUNS Name" from "Duns Name"; to "MWh" from "MW" for "Reservation Amount" column sub-heading. These changes take effect immediately upon implementation for any settlement or resettlement. The first version of this report is expected with the June 2011 resettlement and the September 2011 initial settlement, both distributed after October 20th, 2011. Effective Immediately HTML XLTX CSV
tr_oattsch1rns Modified. Section "Charges" updated column to "Regional Network Load ID" from "Network Load ID"; to "Regional Network Load Name" from "Network Load Name"; to "Pool Monthly Regional Network Load Value" from "Pool Network Load Value" with corresponding subheading updated to "kW-Month" from "kW"; to "Monthly Regional Network Load Value" from "Network Load Value" with corresponding subheading updated to "kW-Month" from "kW". Section "Payments" updated column to "Customer OATT Schedule 1 Revenue Requirements Dollars" from "Participant OATT Schedule 1 Revenue Requirements Dollars"; to "Customer OATT Schedule 1 Revenue Requirements Percent" from "Participant OATT Schedule 1 Revenue Requirements Percent". These changes take effect immediately upon implementation for any settlement or resettlement. The first version of this report is expected with the June 2011 resettlement and the September 2011 initial settlement, both distributed after October 20th, 2011. Effective Immediately HTML XLTX CSV
tr_oattsch9rns

Modified. Section "Charges" updated column to "Regional Network Load ID" from "Network Load ID"; to "Local Network" from "Local Network Serving Load"; to "Regional Network Load Name" from "Network Load Name"; to "Monthly Regional Pool Network Load Value" from "Pool Network Load Value" with corresponding subheading updated to "kW-Month" from "kW"; to "Monthly Regional Network Load Value" from "Network Load Value" with corresponding subheading updated to "kW-Month" from "kW". Section "Payments" updated column to "DUNS Name" from "Duns Name"; to "Customer Schedule 9 Pre-97 Revenue Requirement Dollars" from "Participant Schedule9 Pre-97 Revenue Requirement Dollars"; to "Customer Schedule 9 Pre-97 Revenue Requirement Percent" from "Participant Schedule9 Pre-97 Revenue Requirement Percent"; to "Customer Schedule 9 Post-96 Revenue Requirement Dollars" from "Participant Schedule 9 Post-96 Revenue Requirement Dollars"; to "Customer Schedule 9 Post-96 Revenue Requirement Percent" from "Participant Schedule 9 Post-96 Revenue Requirement Percent". These changes take effect immediately upon implementation for any settlement or resettlement. The first version of this report is expected with the June 2011 resettlement and the September 2011 initial settlement, both distributed after October 20th, 2011.

Effective Immediately HTML XLTX CSV
tr_oattsch1tout Modified. Section "Charges" updated column to "DUNS Name" from "Duns Name"; updated subheading for "Reservation Amount" to "MWh" from "MW". Section "Payments" updated column to "DUNS Name" from "Duns Name"; to "Customer OATT Schedule 1 Revenue Requirements Dollars" from "Participant OATT Schedule 1 Revenue Requirements Dollars"; to "Customer OATT Schedule 1 Revenue Requirements Percent" from "Participant OATT Schedule 1 Revenue Requirements Percent". Section "Detail" updated column to "DUNS Name" from "Duns Name". These changes take effect immediately upon implementation for any settlement or resettlement. The first version of this report is expected with the June 2011 resettlement and the September 2011 initial settlement, both distributed after October 20th, 2011. Effective Immediately HTML XLTX CSV
tr_oattsch8tout Modified. Section "Charges" updated column to "DUNS Name" from "Duns Name"; updated subheading for "Reservation Amount" to "MWh" from "MW". Section "Payments" updated column to "DUNS Name" from "Duns Name". Section "Detail" updated column to "DUNS Name" from "Duns Name"; updated subheading for "Reservation Amount" to "MWh" from "MW". These changes take effect immediately upon implementation for any settlement or resettlement. The first version of this report is expected with the June 2011 resettlement and the September 2011 initial settlement, both distributed after October 20th, 2011. Effective Immediately HTML XLTX CSV
tr_rnsbll

Retired. This report will be terminated effective with obligation month Oct. 1st 2010. It will no longer be published on the ISO external web page effective Oct. 1st obligation month 2010. This report will continue to be published on the ISO External Web page for any resettlement prior to obligation month Oct 1st 2010.

10.01.2010 HTML XLTX CSV
tr_rnsc

Retired. This report will be terminated effective with obligation month Oct. 1st 2010. It will no longer be published on the ISO external web page effective Oct. 1st obligation month 2010. This report will continue to be published on the ISO External Web page for any resettlement prior to the obligation month Oct 1st 2010.

10.01.2010

HTML XLTX CSV
tr_rnsp Retired. This report will be terminated effective with obligation month Oct. 1st 2010. It will no longer be published on the ISO external web page effective Oct. 1st obligation month 2010. This report will continue to be published on the ISO External Web page for any resettlement prior to obligation month Oct 1st 2010. 10.01.2010 HTML XLTX CSV
tr_rnsrat Retired. This report will be terminated effective with obligation month Oct. 1st 2010. It will no longer be published on the ISO external web page effective Oct. 1st obligation month 2010. This report will continue to be published on the ISO External Web page for any resettlement prior to obligation month Oct 1st 2010. 10.01.2010 HTML XLTX CSV
tr_sch2dt Modified. No change in report structure. Modified all columns and descriptions to conform to language in the Transmission, Markets & Services Tariff, Section IV.A, Recovery of ISO Administrative Expenses, Schedule 2 Energy Administrative Service. Any report produced after January 31, 2014, will have these revisions. 01.31.2014 HTML XLTX CSV
tr_sch2tp Modified. No change in report structure. Modified all columns and descriptions to conform to language in the Transmission, Markets & Services Tariff, Section IV.A, Recovery of ISO Administrative Expenses, Schedule 2 Energy Administrative Service. Any report produced after January 31, 2014, will have these revisions. 01.31.2014 HTML XLTX CSV
tr_sch3p1 Existing. Modified the header in the report Template. Replaced "Point to Point" with "Through or Out". 01.01.2008 HTML XLTX CSV
tr_sch3p2 Modified. No change in report structure. Revised description of the "Description" column. Any report produced after January 31, 2014, will have this revision. 01.31.2014 HTML XLTX CSV
tr_throughoroutrt Retired. This report will be terminated effective with obligation month Oct. 1st 2010. It will no longer be published on the ISO external web page effective Oct. 1st obligation month 2010. This report will continue to be published on the ISO External Web page for any resettlement prior to obligation month Oct 1st 2010. 10.01.2010 HTML XLTX CSV
tr_toutbl Retired. This report will be terminated effective with obligation month Oct. 1st 2010. It will no longer be published on the ISO external web page effective Oct. 1st obligation month 2010. This report will continue to be published on the ISO External Web page for any resettlement prior to obligation month Oct 1st 2010. 10.01.2010 HTML XLTX CSV
tr_toutc Retired. This report will be terminated effective with obligation month Oct. 1st 2010. It will no longer be published on the ISO external web page effective Oct. 1st obligation month 2010. This report will continue to be published on the ISO External Web page for any resettlement prior to obligation month Oct 1st 2010. 10.01.2010 HTML XLTX CSV
tr_toutd Retired. This report will be terminated effective with obligation month Oct. 1st 2010. It will no longer be published on the ISO external web page effective Oct. 1st obligation month 2010. This report will continue to be published on the ISO External Web page for any resettlement prior to obligation month Oct 1st 2010. 10.01.2010 HTML XLTX CSV
tr_toutp Retired. This report will be terminated effective with obligation month Oct. 1st 2010. It will no longer be published on the ISO external web page effective Oct. 1st obligation month 2010. This report will continue to be published on the ISO External Web page for any resettlement prior to obligation month Oct 1st 2010. 10.01.2010 HTML XLTX CSV
tr_toutpc Retired. This report will be terminated effective with obligation month Oct. 1st 2010. It will no longer be published on the ISO external web page effective Oct. 1st obligation month 2010. This report will continue to be published on the ISO External Web page for any resettlement prior to obligation month Oct 1st 2010. 10.01.2010 HTML XLTX CSV
ww_blackstart_iso Retired. This report will be issued for any resettlements for any obligation month prior to 01.01.2013. 01.01.2013 HTML XLTX CSV
ww_dahbard Existing. 10.01.2006 HTML XLTX CSV
ww_dahbdemand Modified. Report will include up to, and including, 50 bid segments. 06.01.2011 HTML XLTX CSV
ww_dahbenergy Existing. 03.01.2003 HTML XLTX CSV
ww_dahbreg Retired. 10.01.2005 HTML XLS XLS
ww_dahbregasm Existing. 10.01.2005 HTML XLTX CSV
ww_dalmpc Existing. 05.01.2007 HTML XLTX CSV
ww_dalroffer Existing. 06.01.2005 HTML XLTX CSV
ww_dalrresult Modified. The name of the report changed to "Day-Ahead Demand Reduction Clearing Results Report". Column heading changed from "Day-ahead Load Response Cleared MW" to "Day-Ahead Cleared Demand Reduction MW". 06.01.2012 HTML XLTX CSV
ww_dartimpexphb Existing. 03.01.2003 HTML XLTX CSV
ww_dastlsum Modified. Clarification to description for columns "Settlement Date" and "Release Date" in Day Ahead Settlement Status Section and columns "Resettlement Type" and "Release Date" in Resettlements Section. 09.01.2004 HTML XLTX CSV
ww_deficap Retired. 10.01.2006 HTML XLTX CSV
ww_fcmarahb New. This report will be released no earlier than October 1, 2010 for the Capacity Commitment Period beginning June 1, 2010. 06.01.2010 HTML XLTX CSV
ww_fcmhourlyper Existing. 01.01.2008 HTML XLTX CSV
ww_fcmhrwf Existing. 10.01.2006 Not available XLTX CSV
ww_fcmmonthlyper Existing. 01.01.2008 HTML XLTX CSV
ww_fcmmrahb New. This report will be released no earlier than October 1, 2010 for the June 2010 Obligation Month. 06.01.2010 HTML XLTX CSV

ww_fcmseasonalpeakhour

New. The first version of this report expected to be published onto ISONE external web first week of July 2010 for Obligation Month June 2010. 06.01.2010 HTML XLTX CSV
ww_frm Retired. 03.01.2005 HTML XLS XLS
ww_froffer Existing. 10.01.2006 HTML XLTX CSV
ww_ftrlt Modified.  Added a new column "Auction Name" to the end of the report. This new column will be included on the report distributed May 1, 2013. 10.09.2012 HTML XLTX CSV
ww_ftrmth Modified. Added a new column "Masked Customer ID" to the end of the report. This new column will be included on the report distributed April 1, 2011 for the December 2010 auction month. 12.01.2010 HTML XLTX CSV
ww_network_load_iso New. This report will be released no earlier than February 20, 2013 for the obligation month of January 2013. 01.01.2013 HTML XLTX CSV
ww_ncpcsum Modified. In the LSCPR NCPC section, column heading changed from "DA NCPC Load Obligation" to "DA NCPC - Load Obligation Allocator" with a modified description; modified "DA LSCPR NCPC Rate" description. 01.23.2014 HTML XLTX CSV
ww_rthbard Existing. 01.01.2007 HTML XLTX CSV
ww_rthbenergy Existing. 01.01.2007 HTML XLTX CSV
ww_rtstlsum Modified. Clarification to description for columns "Settlement Date" and "Release Date" in Real Time Settlement Status Section and columns "Resettlement Type" and "Release Date" in Resettlements Section. 09.01.2004 HTML XLTX CSV
ww_supplyicap Retired. 11.01.2006 HTML XLTX CSV
ww_varccrate Modified. Column name change section "VAR Status Report" from "Last Leading Test Date" to "Leading Status Effective Date" and from "Last Lagging Test Date" to "Lagging Status Effective Date". The first version of this report will be posted in December 2012 for the year 2013. 01.01.2012 HTML XLTX CSV
ww_varstatus Modified. Column name change from "Last Leading Test Date" to "Leading Status Effective Date"and from "Last Lagging Test Date"to "Lagging Status Effective Date". The first version of this report will be posted during the second week of January 2012 for obligation month January 2012 following the distribution of report "sd_varccpmt"for obligation month January 2012. 01.01.2012 HTML XLTX CSV
ww_virbidproxy Existing. 05.01.2007 HTML XLTX CSV
  Copyright ©2014 ISO New England Inc.