Glossary & Acronyms

A-C | D-E | F-I | L-N| O-Q | R | S-Z | Acronyms

ACE - Area Control Error

AGC - Automatic Generator Control

ARD - Asset Related Demand

ARR - Auction Revenue Right

ASM - Ancillary Services Market

AREVA - Software vendor (formerly known as ESCA)

CA - Control Area

CAMS - Customer and Asset Management System

CARL - Control Area Reliability

CC - Combined Cycle (generator)

CCF - Carrying Charge Factor

CONE - Cost of New Entry

CONTG - Contingency

COP - Current Operating Plan

CP - Clearing Price

CPS - Control Performance Standard

CT - Combustion Turbine (generator) or State of Connecticut Load Zone, minus SWCT Load Zone (or Rest of Connecticut)

CTR - Capacity Transfer Rights

CZ - Capacity Zone

DA - Day-Ahead (prior to the operating day)

DAALO - Day-Ahead Adjusted Load Obligation

DAANI - Day-Ahead Adjusted Net Interchange

DALO - Day-Ahead Load Obligation

DAGO - Day-Ahead Generation Obligation

DALRP - Day-Ahead Load Response Program

DAM - Day-Ahead Energy Market

DCF - Discounted Cash Flow

DDP - Desired Dispatch Point

dLRR - Daily Local Reserve Requirement

DOE - Department of Energy

DoublC - Program used by ISO Operations Department to monitor system security

ECIR - Export Constrained ICAP Regions

ED - Economic Dispatch

EES - Enhanced Energy Scheduler

EFORd - Demand Estimated Forced Outage Rate

eMkt - Software application used to submit Offers and Bids into the ISO Market

EMS - Energy Management System

ERS - External Reserve Support

ET - External Transactions

FAQ - Frequently Asked Question

FAP - Financial Assurance Policy

FERC - Federal Energy Regulatory Commission

FCA - Forward Capacity Auction

FCM - Forward Capacity Market

FCMS - Financial Credit Management System

FPA - Federal Power Act

FTR - Financial Transmission Right

FRM - Forward Reserve Market

GADS - Generating Availability Data System

GRT - Generation Requirements for Transmission Constraints

HQICC - Hydro Quebec Interconnection Capability Credits

IBCS - Internet Based Communication System

IBL - Internal Bilateral for Load

IBM - Internal Bilateral for Market

IBT - Internal Bilateral Transaction

ICAP - Installed Capacity

ICRs or ICIRs - Import Constrained Regions/Import Constrained ICAP Regions/Installed Capacity Requirements

ICU - Internal Combustion Unit (generator)

IRH - Interconnection Rights Holders

ISO - Independent System Operator a.k.a. ISO New England Inc.

IT - Information Technology

LICAP - Locational Installed Capability

LMP - Locational Marginal Pricing

LRR - Local Reserve Requirement

LSC - Local Second Contingency

LSE - Load Serving Entity

MDB - Market Data Base

MIS - Market Information Server

MR1 - Market Rule 1 (Section III of the Transmission, Markets & services Tariff)

MRR - Manual Response Rate

MSS - Market Support Services

MW - Megawatt

NEMA/Boston - Northeastern Massachusetts/Boston reserve /load zone

NCP - Net Capacity Position

NCPC - Net Commitment Period Compensation

NEPOOL - New England Power Pool

NERC - North American Electric Reliability Council

NPCC - Northeast Power Coordinating Council

OASIS - Open Access Same-Time Information System

OATT - Open Access Transmission Tariff

ODR - Other Demand Resource

OR - Operating Reserve

PACE - Processed Area Control Error

PER - Peak Energy Rent

PTO - Participating Transmission Owners

PTOAC - Participating Transmission Owners Administrative Committee

QUA - Qualified Upgrade Awards

RAA - Reserve Adequacy Analysis

RBF - Regulation Bias Factor

RCP - Regulation Clearing Price

RCPF - Reserve Constraint Penalty Factor

REGO - Regulation Scheduling Software

RMCP - Reserve Market Clearing Price

RMR - Reliability Must Run

RNA - Restated NEPOOL Agreement

RNS - Regional Network Service

ROE - Return On Equity

RoS - Rest of System

RQM - Revenue Quality Meter

RSP - Regional System Plan

RT - Real-Time

RTANI - Real-Time Adjusted Net Interchange

RTANID - Real-Time Adjusted Net Interchange Deviation

RTALO - Real-Time Adjusted Load Obligation

RTGO - Real-Time Generation Obligation

RTLO - Real-Time Load Obligation

RTM - Real-Time Energy Market

RTO - Regional Transmission Organization

SCADA - System Control and Data Acquisition

SCC - Seasonal Claimed Capability

SCR - Special Constrained Resources

SLI - Summary Line Item

SMD - Standard Market Design

SMS - Settlement Market System

STR - Suspension Test Result

SWCT - Southwest Area of the Connecticut Load Zone

TMNSR - Ten-Minute Non-Spinning Reserve

TMOR - Thirty-Minute Operating Reserve

TMSR - Ten-Minute Spinning Reserve

TO - Transmission Owner

TRAGO - Transmission Related Abnormal Generation

TTC - Total Transfer Capacity

UCAP - Unforced Capacity

UDG - Unit Desired Generation

UI - User Interface

VAR - Voltage Amperes Reactive



  Copyright ©2008 ISO New England Inc.