"C","Morning Report" "C","Report for 7/2/2009" "C","Report Generated 07/02/2009 12:45:52 GMT" "H","DESCRIPTION" "H","" "G","Report Type" "D","Morning Report" "H","DATE","TIME" "H","","" "G","1. Report Date" "D","Thursday, Jul 2 2009","08:45:52 EDT" "H","DESCRIPTION","VALUE" "H","","(MW)" "G","2. Peak Load" "D","Wednesday, Jul 1 2009 hour ending 13",17164 "G","3. Operable Capacity Analysis" "D","A. Installed Generating Capacity",31387 "D","B.Capacity Additions EcoMax Bid > SCC",724 "D","C. Pre-OP4 Dispatchable Loads",0 "D","D. Generation Outages and Reductions",1382 "D","E. Uncommitted Available Generation (non fast start)",10154 "G","F. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","NYISO AC Ties",921 "D","NYISO Cross Sound Cable",330 "D","NB",-518 "D","TransEnergie",-1991 "D","Net Deliveries",-1258 "D","G. Total Available Capacity (A+B+C-D-E-F)",21833 "D","H. Peak Load Forecast For Hour 13",17070 "D","I. Total Operating Reserve Requirement",2507 "D","J. Capacity Required",19577 "D","K. Surplus = (+) Deficiency = (-) (G - J)",2256 "D","L. Replacement Reserve Requirement",0 "D","M. Excess Commitment Surplus = (+) Deficiency = (-) (K - L)",2256 "G","4. Largest First Contingency" "D","PHASE II",1775 "G","5. Annual Maintenance Schedule (A.M.S)" "D","Peak Load Exposure",27377 "G","6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1775 "D","Ten Minute Reserve Estimate:",1775 "D","Thirty Minute Reserve Requirement:",732 "D","Thirty Minute Reserve Estimate:",2988 "D","Expected ICU Operation","0" "D","Expected Actions of OP 4:","0" "D","Additional Capacity Available from OP 4 Actions:","0" "H","DESCRIPTION","TRANSFER LIMIT","SCHEDULED CONTRACT" "H","(MW)","(MW)" "G","7. Interchange Summary" "D","NYISO AC Ties",1300,921 "D","NYISO Cross Sound Cable",330,330 "D","NB",-1000,-239 "D","TransEnergie",-2218,-1591 "H","CITY","CONDITIONS","WIND","HIGH TEMP" "H","","","","(F)" "G","8. Weather Forecast Summary for the Peak Hour" "D","Boston","THUNDERSTORMS","E-9",66 "D","Hartford","THUNDERSTORMS","E-5",70 "H","DESCRIPTION","VALUE" "H","","" "G","9. SAR Available" "D","NYISO","Yes" "H","DESCRIPTION","VALUE" "H","","(MW)" "G","10. Capacity of Non-Commercial Units" "D","Total Available",0 "G","11. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "D","0 Units",0 "H","DESCRIPTION","VALUE" "H","","" "G","12. Solar Magnetic Disturbance Activity" "D","Forecast:","" "D","Alert:","" "D","Intensity:","" "D","Observed Activity:","" "D","Actions Taken or Planned by ISO-NE:","" "D","Actions Taken or Planned by Other Control Areas:","" "T","44 Lines"