"C","Morning Report" "C","Report for 2/8/2010" "C","Report Generated 02/08/2010 12:52:16 GMT" "H","DESCRIPTION" "H","" "G","Report Type" "D","Morning Report" "H","DATE","TIME" "H","","" "G","1. Report Date" "D","Monday, Feb 8 2010","07:52:16 EST" "H","DESCRIPTION","VALUE" "H","","(MW)" "G","2. Peak Load" "D","Sunday, Feb 7 2010 hour ending 19",18136 "G","3. Operable Capacity Analysis" "D","A. Installed Generating Capacity",34077 "D","B.Capacity Additions EcoMax Bid > SCC",74 "D","C. Pre-OP4 Dispatchable Loads",0 "D","D. Generation Outages and Reductions",2941 "D","E. Uncommitted Available Generation (non fast start)",9304 "G","F. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","NYISO AC Ties",371 "D","NYISO NNC",100 "D","NYISO CSC",330 "D","NB",34 "D","Phase 2",-1398 "D","Highgate",-218 "D","Net Deliveries",-781 "D","G. Total Available Capacity (A+B+C-D-E-F)",22687 "D","H. Peak Load Forecast For Hour 19",19470 "D","I. Total Operating Reserve Requirement",2189 "D","J. Capacity Required",21659 "D","K. Surplus = (+) Deficiency = (-) (G - J)",1028 "D","L. Replacement Reserve Requirement",0 "D","M. Excess Commitment Surplus = (+) Deficiency = (-) (K - L)",1028 "G","4. Largest First Contingency" "D","MYSTIC 8&9 ",1490 "G","5. Annual Maintenance Schedule (A.M.S)" "D","Peak Load Exposure",21053 "G","6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1490 "D","Ten Minute Reserve Estimate:",1490 "D","Thirty Minute Reserve Requirement:",699 "D","Thirty Minute Reserve Estimate:",1727 "D","Expected ICU Operation","0" "D","Expected Actions of OP 4:","0" "D","Additional Capacity Available from OP 4 Actions:","0" "H","DESCRIPTION","TRANSFER LIMIT IN","TRANSFER LIMIT OUT","SCHEDULED CONTRACT" "H","(MW)","(MW)","(MW)" "G","7. Interchange Summary" "D","NYISO AC Ties",-1400,1200,671 "D","NYISO NNC",-100,100,100 "D","NYISO CSC",-346,330,330 "D","NB",-1000,550,34 "D","Phase 2",-2000,1200,-1398 "D","Highgate",-218,0,-218 "H","CITY","CONDITIONS","WIND","HIGH TEMP" "H","","","","(F)" "G","8. Weather Forecast Summary for the Peak Hour" "D","Boston","PARTLY CLOUDY","NW-15",30 "D","Hartford","PARTLY CLOUDY","NW-11",25 "H","DESCRIPTION","VALUE" "H","","" "G","9. SAR Available" "D","NYISO","Yes" "H","DESCRIPTION","VALUE" "H","","(MW)" "G","10. Capacity of Non-Commercial Units" "D","Total Available",0 "G","11. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "D","0 Units",0 "H","DESCRIPTION","VALUE" "H","","" "G","12. Solar Magnetic Disturbance Activity" "D","Forecast:","" "D","Alert:","" "D","Intensity:","" "D","Observed Activity:","" "D","Actions Taken or Planned by ISO-NE:","" "D","Actions Taken or Planned by Other Control Areas:","" "T","44 Lines"