Status of Proposed Plan & TCA Applications
Approval status of proposed generator and transmission plan applications.

Date Document Title Document Type  
May 01, 2013
Summary of ISO-NE Reviewed TCA Applications under Schedule 12C of the Tariff - Status as of 5/01/13
PDF (388k)
Apr 15, 2013
Determination, conducted by ISO-NE in accordance with Section I.3.9 of the ISO Tariff, that the Applicant's Proposed Plan will not have a significant adverse impact on the New England Transmission System as of 01/05/2012.
PDF (1.1Mb)
  Copyright ©2014 ISO New England Inc.