Regional System Plans
2007
Regional System Plans are ISO-NE's annual planning reports that determine resources and transmission facilities needed to maintain reliable and economic operation of New England's bulk electric power system over a ten-year horizon.

Date Document Title Document Type
Oct 25, 2007 PDF (159k)
Oct 25, 2007 XLS (192k)
Oct 18, 2007 PDF (1.8Mb)
Oct 18, 2007 PDF (930k)
Oct 16, 2007
Presentation by Stephen J. Rourke, ISO-NE Vice President, System Planning, at FERC's October 16, 2007 technical conference in Boston, on the transmission planning provisions of the ISO Tariff
PDF (111k)
Sep 14, 2007 PDF (372k)
Sep 11, 2007
ISO New England presentation of the 2007 Regional System Plan, RSP Public Meeting, Boston
PDF (196k)
Sep 05, 2007
RSP07 table of generating capacity by subarea, SMD load zone and state
DOC (119k)
Aug 10, 2007 PDF (175k)
Aug 10, 2007 XLS (186k)
Jun 28, 2007
Presentation by Stephen Rourke, ISO-NE VP System Planning, at FERC's June 28, 2007, technical conference in Pittsburgh, PA, on ISO's transmission planning strawman.
PDF (871k)
Jun 28, 2007
Access materials from the technical conference on "strawman" proposals on 6/28 and 6/29 on FERC's Web site.
HTML (0.5k)
May 29, 2007
ISO New England's "Strawman" Proposal for Regional Transmission Planning Pursuant to FERC's Order 890 Final Rule
PDF (729k)
Apr 30, 2007 XLS (174k)
Apr 30, 2007 PDF (179k)
  Copyright ©2010 ISO New England Inc.