Energy, Load, and Demand Reports

In this section

Three-Day Reliability Region Demand Forecast

Download the ISO's hourly demand forecast for each day as forecasted in-day and the preceding two days, broken down by reliability region. The region's transmission system is divided into eight reliability regions that reflect the system's operating characteristics and major constraints. New England's load zones, which represent aggregations of pricing nodes within specific areas, generally correspond to these reliability regions.

 

Note: NEMASSBOST = Northeast Massachusetts and Boston Area Reliability Region; SEMASS = Southeast Massachusetts Reliability Region; WCMASS = Western/Central Massachusetts Reliability Region; % = the reliability region's demand as a percentage of the zonal total. The demand included in the forecast is in megawatts (MW).

Forecasts prior to May 24, 2017, can be found on the Three-Day Reliability Region Demand Forecast Archive.

 

Three-Day Reliability Region Demand Forecast
Description Timestamp Download
April 02, 2020 03/31/2020 09:31 AM EDT CSV
April 01, 2020 03/31/2020 09:31 AM EDT CSV
March 31, 2020 03/31/2020 09:31 AM EDT CSV
March 30, 2020 03/30/2020 12:35 PM EDT CSV
March 29, 2020 03/29/2020 12:06 PM EDT CSV
March 28, 2020 03/28/2020 09:35 AM EDT CSV
March 27, 2020 03/27/2020 09:36 AM EDT CSV
March 26, 2020 03/26/2020 09:40 AM EDT CSV
March 25, 2020 03/25/2020 10:06 AM EDT CSV
March 24, 2020 03/24/2020 09:50 AM EDT CSV
March 23, 2020 03/23/2020 09:55 AM EDT CSV
March 22, 2020 03/22/2020 09:44 AM EDT CSV
March 21, 2020 03/21/2020 03:54 PM EDT CSV
March 20, 2020 03/20/2020 09:41 AM EDT CSV
March 19, 2020 03/19/2020 09:42 AM EDT CSV