Real-Time Maps and Charts

Morning Report

Date: 04/18/2024  
 
Produced daily, the Morning Report provides the ISO's best estimate of expected capacity available to meet peak-hour electricity demand and reserve requirements — key parameters used to operate the power system reliably.
 
Report Date
Peak Load(MW)
Operable Capacity Analysis(MW)
A. Capacity Supply Obligation (CSO)
B. Capacity Additions EcoMax Bid > CSO
C. Generation Outages and Reductions
D. Uncommitted Available Generation (non fast start)
E. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)
Net Deliveries
F. Total Available Capacity (A+B-C-D-E)
H. Total Operating Reserve Requirement
I. Capacity Required
J. Surplus = (+) Deficiency = (-) (F - I)
K. Replacement Reserve Requirement
L. Excess Commitment Surplus = (+) Deficiency = (-) (J - K)
Largest First Contingency (MW)
Annual Maintenance Schedule (A.M.S)(MW)
Peak Load Exposure
Reserve Summary(MW)
Ten Minute Reserve Requirement
Ten Minute Reserve Estimate
Thirty Minute Reserve Requirement
Thirty Minute Reserve Estimate
Expected Actions of OP 4
Additional Capacity Available from OP 4 Actions
Interchange Summary(MW)(MW)(MW)
TRANSFER
LIMIT IN
TRANSFER
LIMIT OUT
SCHEDULED
CONTRACT
Weather Forecast Summary for the Peak Hour
CITY CONDITIONS WIND HIGH TEMP(F)
NYISO SAR Available
Total Capacity of Non-Commercial Units (MW)
Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements(MW)
Geomagnetic Disturbance Activity
Forecast
Alert
Intensity
Observed Activity
Actions Taken or Planned by ISO-NE None
Actions Taken or Planned by Other Control Areas None