In this section

Constraints

Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
May 08, 2024 05/07/2024 12:32 PM EDT CSV
May 07, 2024 05/06/2024 12:31 PM EDT CSV
May 06, 2024 05/05/2024 12:38 PM EDT CSV
May 05, 2024 05/04/2024 12:41 PM EDT CSV
May 03, 2024 05/02/2024 12:45 PM EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 05/07/2024 11:25 PM EDT CSV
May 06, 2024 05/06/2024 11:55 PM EDT CSV
May 05, 2024 05/05/2024 11:45 PM EDT CSV
May 04, 2024 05/04/2024 09:15 PM EDT CSV
May 03, 2024 05/03/2024 09:20 PM EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 05/07/2024 11:21 PM EDT CSV
May 06, 2024 05/06/2024 11:21 PM EDT CSV
May 05, 2024 05/05/2024 11:21 PM EDT CSV
May 04, 2024 05/04/2024 11:21 PM EDT CSV
May 03, 2024 05/03/2024 11:21 PM EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 05/06/2024 03:08 PM EDT CSV
May 04, 2024 05/06/2024 03:46 PM EDT CSV
May 03, 2024 05/06/2024 11:48 AM EDT CSV
May 02, 2024 05/03/2024 12:45 PM EDT CSV
May 01, 2024 05/02/2024 02:02 PM EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 05/06/2024 03:08 PM EDT CSV
May 04, 2024 05/06/2024 03:46 PM EDT CSV
May 03, 2024 05/06/2024 11:48 AM EDT CSV
May 02, 2024 05/03/2024 12:45 PM EDT CSV
May 01, 2024 05/02/2024 02:02 PM EDT CSV