Energy, Load, and Demand Reports

In this section

Three-Day Reliability Region Demand Forecast

Download the ISO's hourly demand forecast for each day as forecasted in-day and the preceding two days, broken down by reliability region. The region's transmission system is divided into eight reliability regions that reflect the system's operating characteristics and major constraints. New England's load zones, which represent aggregations of pricing nodes within specific areas, generally correspond to these reliability regions.

 

Note: NEMASSBOST = Northeast Massachusetts and Boston Area Reliability Region; SEMASS = Southeast Massachusetts Reliability Region; WCMASS = Western/Central Massachusetts Reliability Region; % = the reliability region's demand as a percentage of the zonal total. The demand included in the forecast is in megawatts (MW).

Forecasts prior to May 24, 2017, can be found on the Three-Day Reliability Region Demand Forecast Archive.

 

Three-Day Reliability Region Demand Forecast
Description Timestamp Download
April 18, 2024 04/16/2024 09:08 AM EDT CSV
April 17, 2024 04/16/2024 09:08 AM EDT CSV
April 16, 2024 04/16/2024 09:08 AM EDT CSV
April 15, 2024 04/15/2024 09:14 AM EDT CSV
April 14, 2024 04/14/2024 09:34 AM EDT CSV
April 13, 2024 04/13/2024 09:22 AM EDT CSV
April 12, 2024 04/12/2024 03:44 PM EDT CSV
April 11, 2024 04/11/2024 09:19 AM EDT CSV
April 10, 2024 04/10/2024 11:04 AM EDT CSV
April 09, 2024 04/09/2024 04:39 PM EDT CSV
April 08, 2024 04/08/2024 09:19 AM EDT CSV
April 07, 2024 04/07/2024 01:38 PM EDT CSV
April 06, 2024 04/06/2024 01:25 PM EDT CSV
April 05, 2024 04/05/2024 12:26 PM EDT CSV
April 04, 2024 04/04/2024 02:34 PM EDT CSV