Operations Reports

In this section

Single-Source Contingency

See the ISO New England Inc. Transmission, Markets, and Services Tariff, Attachment G Procedure to Protect for the Loss of Phase II Imports, which describes the process used by ISO New England, New York ISO, and PJM to monitor their respective systems and provide the data required by ISO New England to calculate import limits on the Phase I/II high-voltage direct-current interconnection between it and Hydro-Québec TransÉnergie.

Download a report on single-source contingencies, limits placed on external and generation interfaces in which losing a single piece of equipment could cause a loss of 1,200 or greater megawatts (MW).

The single-source contingency limit is the base limit plus the authorized margin multiplied by the margin sensitivity. The NY Central-East single-source contingency limit is based on the authorized margin divided by the Distribution Factor (0.30). The margin associated with NY Station Voltages has been converted to MW.

Note: The compilation of this data has various origins and is provided for the convenience of the New England market participants. The ISO does not assume responsibility for the accuracy.

Single-Source Contingency
Description Timestamp Download
Current - March 28, 2024 03/28/2024 11:46 AM EDT CSV
March 27, 2024 03/27/2024 11:56 PM EDT CSV
March 26, 2024 03/26/2024 11:56 PM EDT CSV
March 25, 2024 03/25/2024 11:56 PM EDT CSV
March 24, 2024 03/24/2024 11:56 PM EDT CSV
March 23, 2024 03/23/2024 11:56 PM EDT CSV
March 22, 2024 03/22/2024 11:56 PM EDT CSV
March 21, 2024 03/21/2024 11:56 PM EDT CSV
March 20, 2024 03/20/2024 11:56 PM EDT CSV
March 19, 2024 03/19/2024 11:56 PM EDT CSV
March 18, 2024 03/18/2024 11:56 PM EDT CSV
March 17, 2024 03/17/2024 11:56 PM EDT CSV
March 16, 2024 03/16/2024 11:56 PM EDT CSV
March 15, 2024 03/15/2024 11:56 PM EDT CSV
March 14, 2024 03/14/2024 11:56 PM EDT CSV