| Feb 24, 2010 |
February 26, 2010 RC Motions Letter revised to reflect change in agenda item 9.0 "MR 1 Section 12.9 Compliance with FERC Order ER10-438" to agenda item 10.0. |
 |
DOC (52k) |
| Feb 23, 2010 |
Presentation regarding 2013/2014 Capacity Committment Period (FCA 4) TSA based on proposed MR 1 Section 12 revisions. |
 |
PPT (606k) |
| Feb 23, 2010 |
OP 2A - Maintenance of Communication, Computers, Metering and Computer Support Equipmant - Itemized Equipment. Updates to reflect installation and maintenance of RTUs at Demand Designated Entities |
 |
ZIP (172k) |
| Feb 23, 2010 |
OP 18G - Metering and Telemetering Criteria - Denamd Response RTU Specifications. Updates to RTU technical specifications |
 |
ZIP (791k) |
| Feb 23, 2010 |
OP 1A - Central Dispatch Operating Responsibility and Authority of ISO-NE, LCCs, and Market Participants. Administrative document updates unrelated to OP 1A changes associated with NUC-001 Reliability Standards |
 |
ZIP (537k) |
| Feb 23, 2010 |
OP 12 - Voltage and Reactive Control. Administrative updates to document |
 |
ZIP (297k) |
| Feb 23, 2010 |
OP 6A - System Restoration - System Restoration Guides |
 |
ZIP (394k) |
| Feb 23, 2010 |
OP 7 - Actions in an Emergency |
 |
ZIP (270k) |
| Feb 23, 2010 |
Administrative Clean Up of the following Operating Procedures in accordance with requirements for annual review of documents: OP 3F (Confidential), 4A, 6C, 6D, 6E, 6F (Confidential), 6G (Confidential), 12A, and 12B |
 |
ZIP (3.2Mb) |
| Feb 23, 2010 |
Operating Procedure 1A changes for NUC-001 Reliability Standards |
 |
ZIP (395k) |
| Feb 23, 2010 |
Operating Procedure 14A changes for NUC-001 Reliability Standards |
 |
ZIP (337k) |
| Feb 23, 2010 |
Operating Procedure 14 NX-12 changes for NUC-001 Reliability Standards |
 |
ZIP (362k) |
| Feb 23, 2010 |
Planning Procedure 3 changes for NUC-001 Reliability Standards |
 |
ZIP (50.3k) |
| Feb 23, 2010 |
Planning Procedure 5-1 changes for NUC-001 Reliability Standards |
 |
ZIP (105k) |
| Feb 23, 2010 |
Planning Procedure 5-3 changes for NUC-001 Reliability Standards |
 |
ZIP (78.2k) |
| Feb 23, 2010 |
Central Maine Power Woodstock TCA |
 |
ZIP (254k) |
| Feb 23, 2010 |
Central Maine Power Section 241 TCA |
 |
PDF (167k) |
| Feb 23, 2010 |
TransCanada Kibby Wind Updated Stability Analysis |
 |
ZIP (1.2Mb) |
| Feb 23, 2010 |
Belmont Municipal Light Department Belmont Substation PPA |
 |
ZIP (1.4Mb) |
| Feb 24, 2010 |
NGRID Western Mass Upgrade PPAs (Level 1) |
 |
ZIP (385k) |
| Feb 23, 2010 |
NSTAR Kingston Switch PPA (Level 1) |
 |
ZIP (68.2k) |
| Feb 23, 2010 |
NSTAR Mystic Transformer PPA (Level 1) |
 |
ZIP (191k) |
| Feb 23, 2010 |
FPL Seabrook Breaker PPA (Level 1) |
 |
DOC (628k) |
| Feb 23, 2010 |
NSTAR Industrial Park PPA (Level 1) |
 |
ZIP (110k) |
| Feb 26, 2010 |
FCM Conforming Changes, RT HOL, presentation, TOP-005-1 Operational Reliability, OP 4 FCM Draft |
 |
ZIP (388k) |
| Feb 25, 2010 |
Zip file updated with revisions to Outline of NEPOOL Comments and Marked Outline of NEPOOL Comments |
 |
ZIP (33.3k) |
| Feb 23, 2010 |
|
 |
DOC (46.5k) |
| Feb 23, 2010 |
ISO-NE and NEPOOL proposal for modification to MR 1 Section III 12.9 on Tie Benefit Calculations for 2010/2011 3rd ARA for ICR |
 |
ZIP (504k) |