Reliability Committee Materials
Feb 26, 2010
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Feb 24, 2010
February 26, 2010 RC Motions Letter revised to reflect change in agenda item 9.0 "MR 1 Section 12.9 Compliance with FERC Order ER10-438" to agenda item 10.0.
DOC (52k)
Feb 23, 2010
Presentation regarding 2013/2014 Capacity Committment Period (FCA 4) TSA based on proposed MR 1 Section 12 revisions.
PPT (606k)
Feb 23, 2010
OP 2A - Maintenance of Communication, Computers, Metering and Computer Support Equipmant - Itemized Equipment. Updates to reflect installation and maintenance of RTUs at Demand Designated Entities
ZIP (172k)
Feb 23, 2010
OP 18G - Metering and Telemetering Criteria - Denamd Response RTU Specifications. Updates to RTU technical specifications
ZIP (791k)
Feb 23, 2010
OP 1A - Central Dispatch Operating Responsibility and Authority of ISO-NE, LCCs, and Market Participants. Administrative document updates unrelated to OP 1A changes associated with NUC-001 Reliability Standards
ZIP (537k)
Feb 23, 2010
OP 12 - Voltage and Reactive Control. Administrative updates to document
ZIP (297k)
Feb 23, 2010
OP 6A - System Restoration - System Restoration Guides
ZIP (394k)
Feb 23, 2010
OP 7 - Actions in an Emergency
ZIP (270k)
Feb 23, 2010
Administrative Clean Up of the following Operating Procedures in accordance with requirements for annual review of documents: OP 3F (Confidential), 4A, 6C, 6D, 6E, 6F (Confidential), 6G (Confidential), 12A, and 12B
ZIP (3.2Mb)
Feb 23, 2010
Operating Procedure 1A changes for NUC-001 Reliability Standards
ZIP (395k)
Feb 23, 2010
Operating Procedure 14A changes for NUC-001 Reliability Standards
ZIP (337k)
Feb 23, 2010
Operating Procedure 14 NX-12 changes for NUC-001 Reliability Standards
ZIP (362k)
Feb 23, 2010
Planning Procedure 3 changes for NUC-001 Reliability Standards
ZIP (50.3k)
Feb 23, 2010
Planning Procedure 5-1 changes for NUC-001 Reliability Standards
ZIP (105k)
Feb 23, 2010
Planning Procedure 5-3 changes for NUC-001 Reliability Standards
ZIP (78.2k)
Feb 23, 2010
Central Maine Power Woodstock TCA
ZIP (254k)
Feb 23, 2010
Central Maine Power Section 241 TCA
PDF (167k)
Feb 23, 2010
TransCanada Kibby Wind Updated Stability Analysis
ZIP (1.2Mb)
Feb 23, 2010
Belmont Municipal Light Department Belmont Substation PPA
ZIP (1.4Mb)
Feb 24, 2010
NGRID Western Mass Upgrade PPAs (Level 1)
ZIP (385k)
Feb 23, 2010
NSTAR Kingston Switch PPA (Level 1)
ZIP (68.2k)
Feb 23, 2010
NSTAR Mystic Transformer PPA (Level 1)
ZIP (191k)
Feb 23, 2010
FPL Seabrook Breaker PPA (Level 1)
DOC (628k)
Feb 23, 2010
NSTAR Industrial Park PPA (Level 1)
ZIP (110k)
Feb 26, 2010
FCM Conforming Changes, RT HOL, presentation, TOP-005-1 Operational Reliability, OP 4 FCM Draft
ZIP (388k)
Feb 25, 2010
Zip file updated with revisions to Outline of NEPOOL Comments and Marked Outline of NEPOOL Comments
ZIP (33.3k)
Feb 23, 2010 DOC (46.5k)
Feb 23, 2010
ISO-NE and NEPOOL proposal for modification to MR 1 Section III 12.9 on Tie Benefit Calculations for 2010/2011 3rd ARA for ICR
ZIP (504k)
  Copyright ©2012 ISO New England Inc.