| Jan 15, 2010 |
January 19, 2010 RC Motion Letter |
 |
DOC (55k) |
| Jan 13, 2010 |
November 17, 2009 Voltage Reduction Test Results Summary Letter |
 |
DOC (352k) |
| Jan 13, 2010 |
November 13, 2009 RC Meeting Minutes |
 |
DOC (105k) |
| Jan 13, 2010 |
PP 10 revisions for overlapping impact analysis for Demand Resources |
 |
ZIP (749k) |
| Jan 14, 2010 |
Central Maine Power Woodstock TCA |
 |
ZIP (254k) |
| Jan 13, 2010 |
NGRID and Northeast Utility Monadnock TCA |
 |
ZIP (154k) |
| Jan 19, 2010 |
Northeast Utilities supporting presentation for the Monadnock TCA |
 |
PDF (159k) |
| Jan 19, 2010 |
Central Maine Power Section 241 PPA Presentation |
 |
PPT (149k) |
| Jan 13, 2010 |
Central Maine Power Section 241 TCA |
 |
PDF (167k) |
| Jan 13, 2010 |
Vermont Energy Investment Corp. Non-Price Retirement Request for a On-Peak Demand Resource |
 |
ZIP (15.4k) |
| Jan 13, 2010 |
Central Maine Power 386 SPS Transmission PPA |
 |
ZIP (804k) |
| Jan 15, 2010 |
NSTAR West Walpole 345 kV Reactor Transmission PPA |
 |
ZIP (503k) |
| Jan 13, 2010 |
Northeast Utility Merrimack 2 Power System Stabilizer and Generator Uprate Transmission and Generator PPAs |
 |
ZIP (1.2Mb) |
| Jan 13, 2010 |
United Illuminating Yale Sterling Generator PPA |
 |
ZIP (2.5Mb) |
| Jan 19, 2010 |
Pawtucket Power Associates PPA for a capacity change for the Pittsfield (Altresco) generator |
 |
ZIP (845k) |
| Jan 19, 2010 |
Pawtucket Power Associates PPA for a capacity change to the Pawtucket Power generator. |
 |
ZIP (870k) |
| Jan 13, 2010 |
Shrewsbury Electric Department PPA to retire 5 existing non-dispatchable generators and re-register as a single dispatchable generator. |
 |
ZIP (792k) |
| Jan 13, 2010 |
Document to be referenced for Agenda Items 8.4, 8.5, and 8.6 |
 |
DOC (31.5k) |
| Jan 19, 2010 |
nuc-001 Power Point summary of ISO-NE Operating Procedure changes to OP 1A, OP 14A, and OP 14 (NX-12) |
 |
PPT (460k) |
| Jan 13, 2010 |
|
 |
PDF (28.8k) |
| Jan 13, 2010 |
OP 1A revisions in support of NUC-001 Reliability Standards for Nuclear Plant Interface Coordination |
 |
ZIP (395k) |
| Jan 13, 2010 |
OP 14A revisions in support of NUC-001 Reliability Standards for Nuclear Plant Interface Coordination |
 |
ZIP (337k) |
| Jan 13, 2010 |
OP 14 NX-12 revisions in support of NUC-001 Reliability Standards for Nuclear Plant Interface Coordination |
 |
ZIP (362k) |
| Jan 13, 2010 |
PP 3 revisions in support of NUC-001 Reliability Standards for Nuclear Plant Interface Coordination |
 |
DOC (98.5k) |
| Jan 13, 2010 |
PP 5-1 revisions in support of NUC-001 Reliability Standards for Nuclear Plant Interface Coordination |
 |
DOC (260k) |
| Jan 13, 2010 |
PP 5-3 revisions in support of NUC-001 Reliability Standards for Nuclear Plant Interface Coordination |
 |
DOC (142k) |
| Jan 15, 2010 |
|
 |
PDF (683k) |