Reliability Committee Materials
Mar 17, 2010
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Mar 16, 2010
February 26, 2010 RC Meeting Minutes - Draft
DOC (103k)
Mar 16, 2010
March 17, 2010 RC Motions Letter - Revision 1
DOC (73.5k)
Mar 12, 2010
PSNH PPA for New Boston Generator (Level I)
ZIP (613k)
Mar 12, 2010
NGRID Central/Western Mass Transmission Improvement TCA
ZIP (1.9Mb)
Mar 12, 2010
NGRID E-205E Refurbishment Project TCA
ZIP (1.7Mb)
Mar 12, 2010
Results and summary of the RIG Replacement Project
PPT (780k)
Mar 12, 2010 PPT (548k)
Mar 12, 2010
OP 12 - Voltage and Reactive Controls updates
ZIP (297k)
Mar 12, 2010
OP 6A System Restoration - System Restoration Guides updates
ZIP (395k)
Mar 12, 2010
OP 7 - Actions in an Emergency updates
ZIP (270k)
Mar 12, 2010
NRG and NU PPAs for the Meridian Generator and Transmission Project (Level III)
ZIP (3.6Mb)
Mar 12, 2010
NGRID and Taunton Municipal Light Plant PPAs for the Taunton Generator and Transmission Project (Level III)
ZIP (4.4Mb)
Mar 12, 2010
UI PPA for the Sikorsky Aircraft Generator Project (Level II)
ZIP (458k)
Mar 16, 2010
FCM Conforming Definitions revised to reflect removal of Real Time High Operating Limit language and addition of NEPOOL Memo on the subject
ZIP (18.8k)
Mar 12, 2010
RSP 10 Long Run Forecast for ICR Calculations presentation
PPT (927k)
Mar 15, 2010
HQICC and Tie Benefit Values used in ICR caluclations for FCA #4
PPT (1005k)
Mar 26, 2010
Presentation revised to reflect correction of MCL values in slide 13.
ZIP (470k)
Mar 12, 2010
Proposed changes to MR 1 Section 12 regarding inclusion of Existing Capacity Import Resources in ICR Calculations
PPT (578k)
Mar 15, 2010
Draft version of the 2010 CELT Report. Informational
XLS (776k)