Reliability Committee Materials
Mar 22, 2010
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
Mar 19, 2010
OP-10 Revision supporting DOE requirement for report of EET's from annually to monthly.
ZIP (571k)
Mar 24, 2010
Presentation revised to reflect edit of Summary of Results Table modeling impact of Orrington South Export Constraint. In addition, LSR references changed to read LRA.
PPT (3.1Mb)
Mar 18, 2010 DOC (46.5k)
  Copyright ©2012 ISO New England Inc.