Installed Capacity Requirements
2013
Annual report on system-wide generating capacity needed to meet reliability standards set by ISO-NE and the Northeast Power Coordinating Council.

Date Document Title Document Type  
Jan 25, 2013
ISO New England Installed Capacity Requirement, Local Sourcing Requirements, and Maximum Capacity Limit for the 2016/17 Capability Year
PDF (723k)
  Copyright ©2013 ISO New England Inc.