In this section

Constraints

Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
April 29, 2024 04/28/2024 12:56 DU EDT CSV
April 28, 2024 04/27/2024 12:48 DU EDT CSV
April 27, 2024 04/26/2024 12:28 DU EDT CSV
April 26, 2024 04/25/2024 12:20 DU EDT CSV
April 25, 2024 04/24/2024 12:28 DU EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 04/29/2024 10:55 DE EDT CSV
April 28, 2024 04/28/2024 10:45 DU EDT CSV
April 27, 2024 04/27/2024 09:45 DU EDT CSV
April 26, 2024 04/26/2024 11:55 DU EDT CSV
April 25, 2024 04/25/2024 11:55 DU EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/29/2024 10:51 DE EDT CSV
April 28, 2024 04/28/2024 11:21 DU EDT CSV
April 27, 2024 04/27/2024 11:21 DU EDT CSV
April 26, 2024 04/26/2024 11:21 DU EDT CSV
April 25, 2024 04/25/2024 11:21 DU EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/26/2024 12:43 DU EDT CSV
April 24, 2024 04/25/2024 01:28 DU EDT CSV
April 23, 2024 04/24/2024 01:24 DU EDT CSV
April 22, 2024 04/23/2024 02:26 DU EDT CSV
April 21, 2024 04/22/2024 03:32 DU EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/26/2024 12:43 DU EDT CSV
April 24, 2024 04/25/2024 01:28 DU EDT CSV
April 23, 2024 04/24/2024 01:24 DU EDT CSV
April 22, 2024 04/23/2024 02:26 DU EDT CSV
April 21, 2024 04/22/2024 03:32 DU EDT CSV