System Planning
Planning for the grid’s future
One of the ISO’s central missions is ensuring that the regional transmission system can reliably deliver power to consumers under a wide range of future system conditions.
One of the ISO’s central missions is ensuring that the regional transmission system can reliably deliver power to consumers under a wide range of future system conditions.
Regional system planning on a 10-year horizon
Long-term forecasts of regional capacity, energy, peak loads, transmission, energy-efficiency savings, and distributed generation growth
Interconnecting to the Administered Transmission System and enabling receipt of electric energy and or capacity capability
Ensuring reliability of and determining cost allocations for new transmission projects in the region
Studies of specific portions of New England’s transmission system
Detailed information related to system planning analyses