In this section

Constraints

Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
May 03, 2024 05/02/2024 12:45 PM EDT CSV
April 30, 2024 04/29/2024 12:21 PM EDT CSV
April 29, 2024 04/28/2024 12:56 PM EDT CSV
April 28, 2024 04/27/2024 12:48 PM EDT CSV
April 27, 2024 04/26/2024 12:28 PM EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 05/02/2024 06:45 PM EDT CSV
May 01, 2024 05/01/2024 11:55 PM EDT CSV
April 30, 2024 04/30/2024 08:05 PM EDT CSV
April 29, 2024 04/29/2024 11:35 PM EDT CSV
April 28, 2024 04/28/2024 10:45 PM EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 05/03/2024 02:21 AM EDT CSV
May 02, 2024 05/02/2024 11:21 PM EDT CSV
May 01, 2024 05/01/2024 11:21 PM EDT CSV
April 30, 2024 04/30/2024 11:21 PM EDT CSV
April 29, 2024 04/29/2024 11:21 PM EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 05/02/2024 02:02 PM EDT CSV
April 30, 2024 05/01/2024 12:48 PM EDT CSV
April 29, 2024 04/30/2024 12:08 PM EDT CSV
April 28, 2024 04/29/2024 01:14 PM EDT CSV
April 27, 2024 04/29/2024 12:34 PM EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 05/02/2024 02:02 PM EDT CSV
April 30, 2024 05/01/2024 12:48 PM EDT CSV
April 29, 2024 04/30/2024 12:08 PM EDT CSV
April 28, 2024 04/29/2024 01:14 PM EDT CSV
April 27, 2024 04/29/2024 12:34 PM EDT CSV