Real-Time Maps and Charts | |
Morning Report
Date: 12/11/2024 | |
|
Report Date | |||
Peak Load | (MW) | ||
Operable Capacity Analysis | (MW) | ||
A. Capacity Supply Obligation (CSO) | |||
B. Capacity Additions EcoMax Bid > CSO | |||
C. Generation Outages and Reductions | |||
D. Uncommitted Available Generation (non fast start) | |||
E. Capacity Deliveries: Net Purchases = (-) Net Sales = (+) | |||
Net Deliveries | |||
F. Total Available Capacity (A+B-C-D-E) | |||
H. Total Operating Reserve Requirement | |||
I. Capacity Required | |||
J. Surplus = (+) Deficiency = (-) (F - I) | |||
K. Replacement Reserve Requirement | |||
L. Excess Commitment Surplus = (+) Deficiency = (-) (J - K) | |||
Largest First Contingency (MW) | |||
Annual Maintenance Schedule (A.M.S) | (MW) | ||
Peak Load Exposure | |||
Reserve Summary | (MW) | ||
Ten Minute Reserve Requirement | |||
Ten Minute Reserve Estimate | |||
Thirty Minute Reserve Requirement | |||
Thirty Minute Reserve Estimate | |||
Expected Actions of OP 4 | |||
Additional Capacity Available from OP 4 Actions | |||
Interchange Summary | (MW) | (MW) | (MW) |
TRANSFER LIMIT IN | TRANSFER LIMIT OUT | SCHEDULED CONTRACT | |
Weather Forecast Summary for the Peak Hour | |||
CITY | CONDITIONS | WIND | HIGH TEMP(F) |
NYISO SAR Available | |||
Total Capacity of Non-Commercial Units (MW) | |||
Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements | (MW) | ||
Geomagnetic Disturbance Activity | |||
Forecast | |||
Alert | |||
Intensity | |||
Observed Activity | |||
Actions Taken or Planned by ISO-NE | None | ||
Actions Taken or Planned by Other Control Areas | None |