Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
April 20, 2019 04/19/2019 12:00 PM EDT CSV
April 19, 2019 04/18/2019 12:00 PM EDT CSV
April 18, 2019 04/17/2019 12:26 PM EDT CSV
April 17, 2019 04/16/2019 12:36 PM EDT CSV
April 16, 2019 04/15/2019 12:41 PM EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 04/20/2019 08:00 AM EDT CSV
April 19, 2019 04/19/2019 09:40 PM EDT CSV
April 18, 2019 04/18/2019 11:55 PM EDT CSV
April 17, 2019 04/17/2019 11:55 PM EDT CSV
April 16, 2019 04/16/2019 11:05 PM EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/20/2019 08:27 AM EDT CSV
April 19, 2019 04/19/2019 11:27 PM EDT CSV
April 18, 2019 04/18/2019 11:27 PM EDT CSV
April 17, 2019 04/17/2019 11:27 PM EDT CSV
April 16, 2019 04/16/2019 11:27 PM EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/19/2019 11:55 AM EDT CSV
April 17, 2019 04/18/2019 11:39 AM EDT CSV
April 16, 2019 04/17/2019 01:49 PM EDT CSV
April 15, 2019 04/16/2019 02:30 PM EDT CSV
April 14, 2019 04/16/2019 10:22 AM EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/19/2019 11:58 AM EDT CSV
April 17, 2019 04/18/2019 11:42 AM EDT CSV
April 16, 2019 04/17/2019 01:51 PM EDT CSV
April 15, 2019 04/16/2019 02:32 PM EDT CSV
April 14, 2019 04/16/2019 10:25 AM EDT CSV