Preliminary Real-Time 15-Minute Binding Constraints

Download a preliminary report on any binding constraints during the operating day. Data include constraint names, marginal value, and the 15-minute interval for marginal value. The time listed in the marginal value interval row indicates the start of the interval; for example, 9:15 indicates the period from 9:15–9:29. Current data are made available in approximate real-time.
 

 
Preliminary Real-Time 15-Minute Binding Constraints
Description Timestamp Download
Current 07/17/2026 04:21 AM EDT CSV
July 03, 2026 07/03/2026 11:21 PM EDT CSV
July 04, 2026 07/04/2026 11:21 PM EDT CSV
July 05, 2026 07/05/2026 11:21 PM EDT CSV
July 06, 2026 07/06/2026 11:18 PM EDT CSV
July 07, 2026 07/07/2026 11:18 PM EDT CSV
July 08, 2026 07/08/2026 11:21 PM EDT CSV
July 09, 2026 07/09/2026 11:21 PM EDT CSV
July 10, 2026 07/10/2026 11:21 PM EDT CSV
July 11, 2026 07/11/2026 11:21 PM EDT CSV
July 12, 2026 07/12/2026 11:21 PM EDT CSV
July 13, 2026 07/13/2026 11:21 PM EDT CSV
July 14, 2026 07/14/2026 11:21 PM EDT CSV
July 15, 2026 07/15/2026 11:21 PM EDT CSV
July 16, 2026 07/16/2026 11:21 PM EDT CSV