Auction Reports and Supporting Data
In this section
- Forward Reserve
- Financial Transmission Rights (FTR)
-
Forward Capacity Market (FCM)
- CCP Information Releases and FCM Delist Bids
- FCA Results
- FCM Monthly Reconfiguration Auction Offers and Bids
- FCM Annual Reconfiguration Auction Offers and Bids
- FCM Annual System Peak Day, Hour, and Load
- FCM Reconfiguration Auction and CSO Bilateral Period Results
- FCM Reconfiguration Auction and CSO Bilateral Period Results Archive
- FCM Seasonal Peak Hour Data
- Capacity Scarcity Condition Report
- Historical FCM Capacity Scarcity Condition Summaries
Related Links
FCM Annual System Peak Day, Hour, and Load
Download a report on annual system peak day, hour, and load as determined using settlement data (rather than operational data), which does not include losses. Information is used in establishing a load asset's contribution to the system peak for the Forward Capacity Market (FCM).
 
Download Selected Files
|